X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545232909020

Well Details

Well ID: 0545232909020
Loading map...
Location: 02/09-29-054-23W5/0
Location Alias: 02/09-29-54-23 W5M
Location Alias 2: 02/09-29-054-23 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 23
Section: 29
County/Municipality: Yellowhead County
Well Name: TOURMALINE SUNDANCE 9-29-54-23
Operator Name: Tourmaline Oil Corp.
License Number: 0479850
License Date: 2016-07-07
License Status: Issued
Spud Date: 2017-01-02
Final Drill Date: 2017-02-02
Well Total Depth: 4696.00 m
Surface Hole Latitude: 53.690733
Surface Hole Longitude: -117.364931

For data sources see[1][2]

Well History

Date Event
2016-07-07 Obtained License
2017-01-02 Direction Drilling Operation Performed - Deviate
2017-01-03 Surface Casing Operation Performed
2017-01-26 Direction Drilling Operation Performed - Horizontal
2017-01-27 Well Log Performed
2017-01-28 Intermediate Casing Operation Performed
2017-02-02 Finished Drilling
2017-02-02 Well Log Performed
2017-02-02 Well Mode changed to Drilled and Cased
2017-02-03 Liner Casing Operation Performed
2017-02-03 Rig Released
2017-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-26 Well Began Production
2017-02-26 Well Fluid changed to Gas
2017-02-26 Well Mode changed to Flowing
2017-02-27 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-02 Nabors Drilling Canada Limited 77 N/A Set Surface
2017-01-22 Nabors Drilling Canada Limited 77 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-02 189.90 Deviate (5 - 79 degrees)
2017-01-26 3243.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-24 Multi-Stage Fracture 4637.20 4637.30 0
2017-02-26 Multi-Stage Fracture 4178.00 4178.10 0
2017-02-26 Multi-Stage Fracture 4126.10 4126.20 0
2017-02-26 Multi-Stage Fracture 4074.10 4074.20 0
2017-02-26 Multi-Stage Fracture 4021.80 4021.90 0
2017-02-26 Multi-Stage Fracture 3969.90 3970.00 0
2017-02-26 Multi-Stage Fracture 3917.60 3917.70 0
2017-02-26 Multi-Stage Fracture 3865.30 3865.40 0
2017-02-26 Multi-Stage Fracture 3813.40 3813.50 0
2017-02-26 Multi-Stage Fracture 3761.60 3761.70 0
2017-02-26 Multi-Stage Fracture 3709.90 3710.00 0
2017-02-26 Multi-Stage Fracture 4592.90 4593.00 0
2017-02-26 Multi-Stage Fracture 3658.20 3658.30 0
2017-02-26 Multi-Stage Fracture 3606.60 3606.70 0
2017-02-27 Multi-Stage Fracture 3554.70 3554.80 0
2017-02-27 Multi-Stage Fracture 3503.20 3503.30 0
2017-02-27 Multi-Stage Fracture 3451.10 3451.20 0
2017-02-27 Multi-Stage Fracture 3399.20 3399.30 0
2017-02-27 Multi-Stage Fracture 3347.20 3347.30 0
2017-02-26 Multi-Stage Fracture 4541.60 4541.70 0
2017-02-26 Multi-Stage Fracture 4489.60 4489.70 0
2017-02-26 Multi-Stage Fracture 4438.10 4438.20 0
2017-02-26 Multi-Stage Fracture 4386.20 4386.30 0
2017-02-26 Multi-Stage Fracture 4334.60 4334.70 0
2017-02-26 Multi-Stage Fracture 4282.30 4282.40 0
2017-02-26 Multi-Stage Fracture 4230.20 4230.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-24 2017-02-27 3,121 5,981 N/A
2 2017-02-26 2017-02-26 3,121 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.4497 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.6472 N/A
silica crystalline 14808-60-7 100 3.6472 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.9353 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7181 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0099 N/A
2-mercaptoethanol 60-24-2 100 0.0099 N/A
dibromoacetonitrile 3252-43-5 100 0.0099 N/A
non-hazardous ingredients Not Available 100 0.0099 N/A
sodium bromide 7647-15-6 100 0.0099 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0891 N/A
water Not Available 100 0.0891 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0872 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0872 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0872 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0872 N/A
non-hazardous ingredients Not Available 100 0.0872 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0419 N/A
methanol 67-56-1 100 0.0419 N/A
water Not Available 100 0.0419 N/A
2 Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 0.5526 N/A
silica crystalline 14808-60-7 100 0.5526 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-25 2017-02-28 Surface Water - River 5084
2017-02-25 2017-02-25 Recycled Fracturing Water (treated at well site) 440
2017-02-26 2017-02-26 Recycled Fracturing Water (treated at well site) 457

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 7066 0.0 0.0 0.0
2018 8748 0.0 0.0 0.0
2019 8383 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-02 No Incident Encountered 0.00 0.00
2017-03-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References