X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545232602022

Well Details

Well ID: 0545232602022
Loading map...
Location: 02/02-26-054-23W5/2
Location Alias: 02/02-26-54-23 W5M
Location Alias 2: 02/02-26-054-23 W5/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 23
Section: 26
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ102 SUNDANCE 2-26-54-23
Operator Name: Tourmaline Oil Corp.
License Number: 0493463
License Date: 2019-01-16
License Status: Amended
Spud Date: 2019-03-05
Final Drill Date: 2019-08-25
Well Total Depth: 5233.80 m
Surface Hole Latitude: 53.708878
Surface Hole Longitude: -117.267780

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-03-05 209.60 Deviate (5 - 79 degrees)
2019-08-15 3000.30 Horizontal
2019-08-19 3514.00 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-25 Multi-Stage Fracture 5134.90 5135.00 0
2019-10-26 Multi-Stage Fracture 4674.50 4674.60 0
2019-10-26 Multi-Stage Fracture 4622.10 4622.20 0
2019-10-26 Multi-Stage Fracture 4569.80 4569.90 0
2019-10-26 Multi-Stage Fracture 4517.50 4517.60 0
2019-10-26 Multi-Stage Fracture 4465.20 4465.30 0
2019-10-26 Multi-Stage Fracture 4412.80 4412.90 0
2019-10-26 Multi-Stage Fracture 4360.60 4360.70 0
2019-10-26 Multi-Stage Fracture 4308.10 4308.20 0
2019-10-26 Multi-Stage Fracture 4256.00 4256.10 0
2019-10-26 Multi-Stage Fracture 4203.90 4204.00 0
2019-10-25 Multi-Stage Fracture 5093.60 5093.70 0
2019-10-26 Multi-Stage Fracture 4151.50 4151.60 0
2019-10-26 Multi-Stage Fracture 4099.40 4099.50 0
2019-10-26 Multi-Stage Fracture 4046.90 4047.00 0
2019-10-26 Multi-Stage Fracture 3994.50 3994.60 0
2019-10-26 Multi-Stage Fracture 3942.70 3942.80 0
2019-10-26 Multi-Stage Fracture 3890.40 3890.50 0
2019-10-26 Multi-Stage Fracture 3838.00 3838.10 0
2019-10-26 Multi-Stage Fracture 3785.60 3785.70 0
2019-10-26 Multi-Stage Fracture 3733.10 3733.20 0
2019-10-26 Multi-Stage Fracture 3693.50 3693.60 0
2019-10-25 Multi-Stage Fracture 5041.30 5041.40 0
2019-10-26 Multi-Stage Fracture 3626.20 3626.30 0
2019-10-27 Multi-Stage Fracture 3574.00 3574.10 0
2019-10-27 Multi-Stage Fracture 3521.60 3521.70 0
2019-10-27 Multi-Stage Fracture 3469.10 3469.20 0
2019-10-27 Multi-Stage Fracture 3378.30 3378.40 0
2019-10-27 Multi-Stage Fracture 3325.70 3325.80 0
2019-10-27 Multi-Stage Fracture 3274.20 3274.30 0
2019-10-27 Multi-Stage Fracture 3222.00 3222.10 0
2019-10-27 Multi-Stage Fracture 3169.60 3169.70 0
2019-10-27 Multi-Stage Fracture 3002.90 3003.00 0
2019-10-25 Multi-Stage Fracture 4988.90 4989.00 0
2019-10-25 Multi-Stage Fracture 4936.60 4936.70 0
2019-10-26 Multi-Stage Fracture 4884.20 4884.30 0
2019-10-26 Multi-Stage Fracture 4831.80 4831.90 0
2019-10-26 Multi-Stage Fracture 4779.40 4779.50 0
2019-10-26 Multi-Stage Fracture 4727.00 4727.10 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-25 2019-10-27 2,915 8,289 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.2747 N/A
Sand - Tier 1 40/70 Trican silica crystalline 14808-60-7 100 11.6695 N/A
Sand - Tier 2 50/140 Trican silica crystalline 14808-60-7 100 1.9655 N/A
WayProp (40/70) Trican phenolic resin 9003-35-4 100 3.8898 N/A
silica crystalline 14808-60-7 100 3.8898 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0153 N/A
dibromoacetonitrile 3252-43-5 100 0.0153 N/A
non-hazardous ingredients Not Available 100 0.0153 N/A
polyethylene glycol 25322-68-3 100 0.0153 N/A
sodium bromide 7647-15-6 100 0.0153 N/A
CC-7 Clay Stabilizer Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0901 N/A
water Not Available 100 0.0901 N/A
FR-22 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0498 N/A
non-hazardous ingredients Not Available 100 0.0498 N/A
S-17X Surfactant Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.045 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.045 N/A
methanol 67-56-1 100 0.045 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.045 N/A
non-hazardous ingredients Not Available 100 0.045 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-26 2019-10-21 Oilfield Produced Water 3675
2019-10-26 2019-11-01 Surface Water - River 3896
2019-10-26 2019-10-27 Recycled Fracturing Water (treated at well site) 718

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1368 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-25 No Incident Encountered 0.00 0.00
2019-11-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References