X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545232602000

Well Details

Well ID: 0545232602000
Loading map...
Location: 00/02-26-054-23W5/0
Location Alias: 00/02-26-54-23 W5M
Location Alias 2: 00/02-26-054-23 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 23
Section: 26
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ SUNDANCE 2-26-54-23
Operator Name: Tourmaline Oil Corp.
License Number: 0493459
License Date: 2019-01-16
License Status: Issued
Spud Date: 2019-03-06
Final Drill Date: 2019-08-08
Well Total Depth: 5378.00 m
Surface Hole Latitude: 53.708912
Surface Hole Longitude: -117.267733

For data sources see[1][2]

Well History

Date Event
2019-01-16 Obtained License
2019-03-06 Lost Circulation Occurred
2019-03-07 Direction Drilling Operation Performed - Deviate
2019-03-08 Surface Casing Operation Performed
2019-07-30 Resumption
2019-08-03 Well Log Performed
2019-08-04 Direction Drilling Operation Performed - Horizontal
2019-08-08 Finished Drilling
2019-08-08 Well Log Performed
2019-08-08 Well Mode changed to Drilled and Cased
2019-08-09 Production Casing Operation Performed
2019-08-09 Well Log Performed
2019-08-10 Rig Released
2019-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-30 Well Began Production
2019-10-30 Well Fluid changed to Gas
2019-10-30 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-06 Nabors Drilling Limited 58 N/A Set Surface
2019-07-30 Nabors Drilling Limited 58 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-07 217.50 Deviate (5 - 79 degrees)
2019-08-04 3191.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-27 Multi-Stage Fracture 5308.60 5308.70 0
2019-10-28 Multi-Stage Fracture 4848.60 4848.70 0
2019-10-28 Multi-Stage Fracture 4796.30 4796.40 0
2019-10-28 Multi-Stage Fracture 4743.80 4743.90 0
2019-10-28 Multi-Stage Fracture 4691.40 4691.50 0
2019-10-28 Multi-Stage Fracture 4639.00 4639.10 0
2019-10-28 Multi-Stage Fracture 4586.60 4586.70 0
2019-10-28 Multi-Stage Fracture 4534.20 4534.30 0
2019-10-28 Multi-Stage Fracture 4481.90 4482.00 0
2019-10-28 Multi-Stage Fracture 4429.50 4429.60 0
2019-10-28 Multi-Stage Fracture 4377.10 4377.20 0
2019-10-27 Multi-Stage Fracture 5267.20 5267.30 0
2019-10-28 Multi-Stage Fracture 4324.80 4324.90 0
2019-10-28 Multi-Stage Fracture 4272.50 4272.60 0
2019-10-28 Multi-Stage Fracture 4220.10 4220.20 0
2019-10-28 Multi-Stage Fracture 4167.80 4167.90 0
2019-10-28 Multi-Stage Fracture 4115.50 4115.60 0
2019-10-28 Multi-Stage Fracture 4063.00 4063.10 0
2019-10-28 Multi-Stage Fracture 4010.50 4010.60 0
2019-10-28 Multi-Stage Fracture 3958.20 3958.30 0
2019-10-28 Multi-Stage Fracture 3905.70 3905.80 0
2019-10-28 Multi-Stage Fracture 3853.20 3853.30 0
2019-10-27 Multi-Stage Fracture 5214.70 5214.80 0
2019-10-28 Multi-Stage Fracture 3800.90 3801.00 0
2019-10-29 Multi-Stage Fracture 3748.90 3749.00 0
2019-10-29 Multi-Stage Fracture 3696.50 3696.60 0
2019-10-29 Multi-Stage Fracture 3644.20 3644.30 0
2019-10-29 Multi-Stage Fracture 3591.70 3591.80 0
2019-10-29 Multi-Stage Fracture 3539.40 3539.50 0
2019-10-29 Multi-Stage Fracture 3487.00 3487.10 0
2019-10-29 Multi-Stage Fracture 3434.60 3434.70 0
2019-10-29 Multi-Stage Fracture 3382.20 3382.30 0
2019-10-29 Multi-Stage Fracture 3329.90 3330.00 0
2019-10-27 Multi-Stage Fracture 5162.10 5162.20 0
2019-10-29 Multi-Stage Fracture 3290.40 3290.50 0
2019-10-29 Multi-Stage Fracture 3250.60 3250.70 0
2019-10-27 Multi-Stage Fracture 5109.60 5109.70 0
2019-10-27 Multi-Stage Fracture 5057.40 5057.50 0
2019-10-28 Multi-Stage Fracture 5005.60 5005.70 0
2019-10-28 Multi-Stage Fracture 4953.50 4953.60 0
2019-10-28 Multi-Stage Fracture 4901.10 4901.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-27 2019-10-29 3,068 8,846 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.4735 N/A
Sand - Tier 1 40/70 Trican silica crystalline 14808-60-7 100 11.5398 N/A
Sand - Tier 2 50/140 Trican silica crystalline 14808-60-7 100 1.9445 N/A
WayProp (40/70) Trican phenolic resin 9003-35-4 100 3.8465 N/A
silica crystalline 14808-60-7 100 3.8465 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0125 N/A
dibromoacetonitrile 3252-43-5 100 0.0125 N/A
non-hazardous ingredients Not Available 100 0.0125 N/A
polyethylene glycol 25322-68-3 100 0.0125 N/A
sodium bromide 7647-15-6 100 0.0125 N/A
CC-7 Clay Stabilizer Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0911 N/A
water Not Available 100 0.0911 N/A
FR-22 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0482 N/A
non-hazardous ingredients Not Available 100 0.0482 N/A
S-17X Surfactant Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0435 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0435 N/A
methanol 67-56-1 100 0.0435 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0435 N/A
non-hazardous ingredients Not Available 100 0.0435 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-10-26 2019-10-31 Recycled Fracturing Water (treated at well site) 1653
2019-10-27 2019-10-31 Recycled Fracturing Water (treated at well site) 800
2019-10-26 2019-11-01 Surface Water - River 3620
2019-10-26 2019-10-29 Recycled Fracturing Water (treated at well site) 2773

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1344 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-06 Lost Circulation 75.00 400.00
2019-11-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References