X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545232413000

Well Details

Well ID: 0545232413000
Loading map...
Location: 00/13-24-054-23W5/0
Location Alias: 00/13-24-54-23 W5M
Location Alias 2: 00/13-24-054-23 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 23
Section: 24
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ SUNDANCE 13-24-54-23
Operator Name: Tourmaline Oil Corp.
License Number: 0483415
License Date: 2017-04-17
License Status: Issued
Spud Date: 2017-10-30
Final Drill Date: 2017-11-10
Well Total Depth: 4473.00 m
Surface Hole Latitude: 53.670889
Surface Hole Longitude: -117.259729

For data sources see[1][2]

Well History

Date Event
2017-04-17 Obtained License
2017-10-30 Surface Casing Operation Performed
2017-11-03 Direction Drilling Operation Performed - Deviate
2017-11-05 Direction Drilling Operation Performed - Horizontal
2017-11-06 Well Log Performed
2017-11-07 Intermediate Casing Operation Performed
2017-11-10 Finished Drilling
2017-11-10 Well Mode changed to Drilled and Cased
2017-11-11 Liner Casing Operation Performed
2017-11-11 Well Log Performed
2017-11-12 Rig Released
2018-01-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-08 Well Began Production
2018-01-08 Well Fluid changed to Gas
2018-01-08 Well Mode changed to Flowing
2019-12-05 Well Fluid changed to Gas
2019-12-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-10-30 Nabors Drilling Canada Limited 77 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-03 2711.20 Deviate (5 - 79 degrees)
2017-11-05 3116.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-01 Multi-Stage Fracture 4421.30 4421.40 0
2018-01-07 Multi-Stage Fracture 3958.10 3958.20 0
2018-01-07 Multi-Stage Fracture 3905.30 3905.40 0
2018-01-07 Multi-Stage Fracture 3852.80 3852.90 0
2018-01-07 Multi-Stage Fracture 3799.90 3800.00 0
2018-01-07 Multi-Stage Fracture 3747.00 3747.10 0
2018-01-07 Multi-Stage Fracture 3694.10 3694.20 0
2018-01-07 Multi-Stage Fracture 3641.60 3641.70 0
2018-01-07 Multi-Stage Fracture 3588.70 3588.80 0
2018-01-07 Multi-Stage Fracture 3536.10 3536.20 0
2018-01-07 Multi-Stage Fracture 3483.20 3483.30 0
2018-01-06 Multi-Stage Fracture 4379.50 4379.60 0
2018-01-07 Multi-Stage Fracture 3430.30 3430.40 0
2018-01-07 Multi-Stage Fracture 3377.40 3377.50 0
2018-01-07 Multi-Stage Fracture 3324.50 3324.60 0
2018-01-07 Multi-Stage Fracture 3271.60 3271.70 0
2018-01-07 Multi-Stage Fracture 3218.90 3219.00 0
2018-01-06 Multi-Stage Fracture 4326.70 4326.80 0
2018-01-06 Multi-Stage Fracture 4274.10 4274.20 0
2018-01-06 Multi-Stage Fracture 4222.20 4222.30 0
2018-01-06 Multi-Stage Fracture 4169.30 4169.40 0
2018-01-06 Multi-Stage Fracture 4116.80 4116.90 0
2018-01-07 Multi-Stage Fracture 4063.90 4064.00 0
2018-01-07 Multi-Stage Fracture 4011.00 4011.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-01 2018-01-07 2,970 5,616 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.658 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.6973 N/A
silica crystalline 14808-60-7 100 3.6973 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.6547 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7906 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0206 N/A
dibromoacetonitrile 3252-43-5 100 0.0207 N/A
non-hazardous ingredients Not Available 100 0.0206 N/A
polyethylene glycol 25322-68-3 100 0.0206 N/A
sodium bromide 7647-15-6 100 0.0206 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0903 N/A
water Not Available 100 0.0903 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0467 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0467 N/A
non-hazardous ingredients Not Available 100 0.0467 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0413 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0413 N/A
methanol 67-56-1 100 0.0413 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0413 N/A
non-hazardous ingredients Not Available 100 0.0413 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-04 2018-01-07 Surface Water - River 1618
2017-12-29 2017-12-29 Oilfield Produced Water 1838
2018-01-04 2018-01-06 Recycled Fracturing Water (treated at well site) 1369
2018-01-03 2018-01-05 Recycled Fracturing Water (treated at well site) 791

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7884 0.0 0.0 0.0
2019 8504 0.0 0.0 0.0
2020 2152 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-10 No Incident Encountered 0.00 0.00
2018-01-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References