X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545232301030

Well Details

Well ID: 0545232301030
Loading map...
Location: 03/01-23-054-23W5/0
Location Alias: 03/01-23-54-23 W5M
Location Alias 2: 03/01-23-054-23 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 23
Section: 23
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ103 SUNDANCE 1-23-54-23
Operator Name: Tourmaline Oil Corp.
License Number: 0492841
License Date: 2018-12-18
License Status: Issued
Spud Date: 2019-01-20
Final Drill Date: 2019-02-19
Well Total Depth: 5170.00 m
Surface Hole Latitude: 53.688579
Surface Hole Longitude: -117.292753

For data sources see[1][2]

Well History

Date Event
2018-12-18 Obtained License
2019-01-21 Surface Casing Operation Performed
2019-02-11 Direction Drilling Operation Performed - Deviate
2019-02-12 Direction Drilling Operation Performed - Horizontal
2019-02-12 Well Log Performed
2019-02-14 Intermediate Casing Operation Performed
2019-02-19 Finished Drilling
2019-02-19 Well Log Performed
2019-02-19 Well Mode changed to Drilled and Cased
2019-02-21 Well Log Performed
2019-02-22 Liner Casing Operation Performed
2019-02-23 Rig Released
2019-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-18 Well Began Production
2019-06-18 Well Fluid changed to Gas
2019-06-18 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-08 Nabors Drilling Canada Limited 16 N/A Resumption
2019-01-20 Nabors Drilling Canada Limited 16 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-11 2541.80 Deviate (5 - 79 degrees)
2019-02-12 3031.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-14 Multi-Stage Fracture 5075.20 5075.30 0
2019-06-15 Multi-Stage Fracture 4610.80 4610.90 0
2019-06-15 Multi-Stage Fracture 4557.90 4558.00 0
2019-06-15 Multi-Stage Fracture 4505.00 4505.10 0
2019-06-15 Multi-Stage Fracture 4452.10 4452.20 0
2019-06-15 Multi-Stage Fracture 4399.20 4399.30 0
2019-06-16 Multi-Stage Fracture 4346.30 4346.40 0
2019-06-16 Multi-Stage Fracture 4293.40 4293.50 0
2019-06-16 Multi-Stage Fracture 4241.10 4241.20 0
2019-06-16 Multi-Stage Fracture 4188.10 4188.20 0
2019-06-16 Multi-Stage Fracture 4135.20 4135.30 0
2019-06-14 Multi-Stage Fracture 5033.40 5033.50 0
2019-06-16 Multi-Stage Fracture 4082.30 4082.40 0
2019-06-17 Multi-Stage Fracture 4029.30 4029.40 0
2019-06-17 Multi-Stage Fracture 3976.30 3976.40 0
2019-06-17 Multi-Stage Fracture 3923.30 3923.40 0
2019-06-17 Multi-Stage Fracture 3870.30 3870.40 0
2019-06-17 Multi-Stage Fracture 3817.40 3817.50 0
2019-06-17 Multi-Stage Fracture 3764.40 3764.50 0
2019-06-17 Multi-Stage Fracture 3711.70 3711.80 0
2019-06-17 Multi-Stage Fracture 3658.80 3658.90 0
2019-06-17 Multi-Stage Fracture 3605.90 3606.00 0
2019-06-15 Multi-Stage Fracture 4980.50 4980.60 0
2019-06-17 Multi-Stage Fracture 3553.00 3553.10 0
2019-06-17 Multi-Stage Fracture 3500.10 3500.20 0
2019-06-17 Multi-Stage Fracture 3447.20 3447.30 0
2019-06-18 Multi-Stage Fracture 3394.50 3394.60 0
2019-06-18 Multi-Stage Fracture 3341.60 3341.70 0
2019-06-18 Multi-Stage Fracture 3289.00 3289.10 0
2019-06-18 Multi-Stage Fracture 3236.10 3236.20 0
2019-06-18 Multi-Stage Fracture 3183.20 3183.30 0
2019-06-18 Multi-Stage Fracture 3130.30 3130.40 0
2019-06-18 Multi-Stage Fracture 3090.00 3090.10 0
2019-06-15 Multi-Stage Fracture 4928.10 4928.20 0
2019-06-15 Multi-Stage Fracture 4875.10 4875.20 0
2019-06-15 Multi-Stage Fracture 4822.40 4822.50 0
2019-06-15 Multi-Stage Fracture 4769.50 4769.60 0
2019-06-15 Multi-Stage Fracture 4716.60 4716.70 0
2019-06-15 Multi-Stage Fracture 4663.70 4663.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-14 2019-06-18 2,912 9,298 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 86.182 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.3409 N/A
silica crystalline 14808-60-7 100 3.3409 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.0228 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7595 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0113 N/A
dibromoacetonitrile 3252-43-5 100 0.0113 N/A
non-hazardous ingredients Not Available 100 0.0113 N/A
polyethylene glycol 25322-68-3 100 0.0113 N/A
sodium bromide 7647-15-6 100 0.0113 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0899 N/A
water Not Available 100 0.0899 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0576 N/A
non-hazardous ingredients Not Available 100 0.0576 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0415 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0415 N/A
methanol 67-56-1 100 0.0415 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0415 N/A
non-hazardous ingredients Not Available 100 0.0415 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-05 2019-06-20 Surface Water - River 7510
2019-06-15 2019-06-18 Recycled Fracturing Water (treated at well site) 1788

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4296 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-19 No Incident Encountered 0.00 0.00
2019-06-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References