X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545223208025

Well Details

Well ID: 0545223208025
Loading map...
Location: 02/08-32-054-22W5/5
Location Alias: 02/08-32-54-22 W5M
Location Alias 2: 02/08-32-054-22 W5/05
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 22
Section: 32
County/Municipality: Yellowhead County
Well Name: CNRL 102 SUNDANCE 8-32-54-22
Operator Name: Canadian Natural Resources Limited
License Number: 0426495
License Date: 2010-11-29
License Status: Issued
Spud Date: 2010-12-13
Final Drill Date: 2011-01-05
Well Total Depth: 3110.00 m
Surface Hole Latitude: 53.705062
Surface Hole Longitude: -117.200649

For data sources see[1][2]

Well History

Date Event
2010-11-29 Obtained License
2010-12-16 Surface Casing Operation Performed
2010-12-29 Direction Drilling Operation Performed - Deviate
2011-01-05 Finished Drilling
2011-01-05 Well Log Performed
2011-01-05 Well Mode changed to Drilled and Cased
2011-01-06 Well Log Performed
2011-01-07 Production Casing Operation Performed
2011-01-07 Rig Released
2011-01-22 Perforation Treatment Performed - Jet Perforation
2011-01-23 Perforation Treatment Performed - Fractured
2011-01-24 Perforation Treatment Performed - Jet Perforation
2011-01-25 Perforation Treatment Performed - Fractured
2011-01-26 Perforation Treatment Performed - Jet Perforation
2011-01-27 Perforation Treatment Performed - Fractured
2011-02-15 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-29 1363.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-22 Perforation 3074.50 3075.00 8
2011-01-26 Perforation 2735.50 2736.00 10
2011-01-26 Perforation 2589.50 2590.00 6
2011-01-26 Perforation 2757.80 2758.30 10
2011-01-26 Perforation 2745.50 2746.00 10
2011-01-27 Fracture 2589.50 2590.00 0
2011-01-27 Fracture 2735.50 2758.30 0
2011-01-22 Perforation 2974.00 2974.50 8
2011-01-22 Perforation 3095.50 3096.00 8
2011-01-23 Fracture 2974.00 3075.00 0
2011-01-23 Fracture 3095.50 3096.00 0
2011-01-24 Perforation 2816.50 2817.00 8
2011-01-24 Perforation 2853.00 2853.50 8
2011-01-24 Perforation 2899.00 2899.50 8
2011-01-25 Fracture 2816.50 2899.50 0

For data sources see[5]



References