If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0545221102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.642458,"lon":-117.137767,"icon":""}]} |
Location: 00/02-11-054-22W5/0 | |
Location Alias: 00/02-11-54-22 W5M | |
Location Alias 2: 00/02-11-054-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 5 | |
Range: 22 | |
Section: 11 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE SUNDANCE 2-11-54-22 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0415409 | |
License Date: 2009-12-10 | |
License Status: Issued | |
Spud Date: 2010-02-01 | |
Final Drill Date: 2010-02-13 | |
Well Total Depth: 3267.00 m | |
Surface Hole Latitude: 53.642458 | |
Surface Hole Longitude: -117.137767 |
Date | Event |
---|---|
2009-12-10 | Obtained License |
2010-02-02 | Direction Drilling Operation Performed - Deviate |
2010-02-03 | Surface Casing Operation Performed |
2010-02-13 | Finished Drilling |
2010-02-13 | Well Log Performed |
2010-02-13 | Well Mode changed to Drilled and Cased |
2010-02-14 | Well Log Performed |
2010-02-15 | Production Casing Operation Performed |
2010-02-15 | Rig Released |
2010-03-02 | Perforation Treatment Performed - Fractured |
2010-03-02 | Perforation Treatment Performed - Jet Perforation |
2010-03-05 | Perforation Treatment Performed - Jet Perforation |
2010-03-06 | Perforation Treatment Performed - Fractured |
2010-03-06 | Perforation Treatment Performed - Jet Perforation |
2010-03-07 | Perforation Treatment Performed - Fractured |
2010-03-07 | Perforation Treatment Performed - Jet Perforation |
2010-04-02 | Well Began Production |
2010-04-02 | Well Fluid changed to Gas |
2010-04-02 | Well Mode changed to Flowing |
2012-09-20 | Well Fluid changed to Gas |
2012-09-20 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-02 | 152.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-03-02 | Perforation | 3250.00 | 3250.60 | 10 |
2010-03-06 | Perforation | 3067.00 | 3067.30 | 10 |
2010-03-06 | Perforation | 3057.00 | 3057.30 | 10 |
2010-03-06 | Perforation | 3052.00 | 3052.60 | 10 |
2010-03-06 | Perforation | 3046.00 | 3046.60 | 10 |
2010-03-06 | Perforation | 3035.00 | 3035.30 | 10 |
2010-03-06 | Perforation | 3028.50 | 3028.80 | 10 |
2010-03-06 | Fracture | 3028.50 | 3123.30 | 0 |
2010-03-06 | Perforation | 2954.00 | 2954.60 | 10 |
2010-03-06 | Perforation | 2943.00 | 2943.60 | 10 |
2010-03-06 | Perforation | 2938.00 | 2938.60 | 10 |
2010-03-02 | Perforation | 3245.00 | 3245.30 | 10 |
2010-03-06 | Perforation | 2932.00 | 2932.30 | 10 |
2010-03-06 | Perforation | 2910.00 | 2910.60 | 10 |
2010-03-06 | Perforation | 2906.00 | 2906.30 | 10 |
2010-03-06 | Fracture | 2906.00 | 2954.60 | 0 |
2010-03-06 | Perforation | 2891.00 | 2892.00 | 9 |
2010-03-06 | Perforation | 2884.00 | 2885.00 | 9 |
2010-03-06 | Perforation | 2877.00 | 2878.00 | 9 |
2010-03-06 | Perforation | 2866.50 | 2866.80 | 10 |
2010-03-07 | Fracture | 2866.50 | 2892.00 | 0 |
2010-03-07 | Perforation | 2780.00 | 2780.60 | 10 |
2010-03-02 | Perforation | 3241.00 | 3241.60 | 10 |
2010-03-07 | Perforation | 2773.00 | 2774.20 | 10 |
2010-03-07 | Perforation | 2746.00 | 2747.20 | 10 |
2010-03-07 | Fracture | 2746.00 | 2780.60 | 0 |
2010-03-02 | Perforation | 3236.00 | 3236.60 | 10 |
2010-03-02 | Perforation | 3231.00 | 3231.60 | 10 |
2010-03-02 | Perforation | 3225.50 | 3225.80 | 10 |
2010-03-02 | Fracture | 3225.50 | 3250.60 | 0 |
2010-03-05 | Perforation | 3123.00 | 3123.30 | 10 |
2010-03-05 | Perforation | 3108.00 | 3108.30 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 6555 | 0.0 | 0.0 | 0.0 |
2011 | 8559 | 0.0 | 0.0 | 0.0 |
2012 | 8472 | 0.0 | 0.0 | 0.0 |
2013 | 8560 | 0.0 | 0.0 | 0.0 |
2014 | 8711 | 0.0 | 0.0 | 0.0 |
2015 | 8713 | 0.0 | 0.0 | 0.0 |
2016 | 8297 | 0.0 | 0.0 | 0.0 |
2017 | 8663 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]