If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0545211704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.663019,"lon":-117.065173,"icon":""}]} |
Location: 00/04-17-054-21W5/0 | |
Location Alias: 00/04-17-54-21 W5M | |
Location Alias 2: 00/04-17-054-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 5 | |
Range: 21 | |
Section: 17 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE SUNDANCE 4-17-54-21 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0430130 | |
License Date: 2011-01-17 | |
License Status: Issued | |
Spud Date: 2011-02-23 | |
Final Drill Date: 2011-03-06 | |
Well Total Depth: 3237.00 m | |
Surface Hole Latitude: 53.663019 | |
Surface Hole Longitude: -117.065173 |
Date | Event |
---|---|
2011-01-17 | Obtained License |
2011-02-23 | Direction Drilling Operation Performed - Deviate |
2011-02-27 | Surface Casing Operation Performed |
2011-03-06 | Finished Drilling |
2011-03-06 | Well Mode changed to Drilled and Cased |
2011-03-07 | Well Log Performed |
2011-03-08 | Production Casing Operation Performed |
2011-03-08 | Well Log Performed |
2011-03-09 | Rig Released |
2011-09-15 | Perforation Treatment Performed - Jet Perforation |
2011-09-17 | Perforation Treatment Performed - Fractured |
2011-09-18 | Perforation Treatment Performed - Jet Perforation |
2011-09-21 | Perforation Treatment Performed - Fractured |
2011-09-22 | Perforation Treatment Performed - Jet Perforation |
2011-09-23 | Perforation Treatment Performed - Fractured |
2011-09-24 | Perforation Treatment Performed - Fractured |
2011-09-24 | Perforation Treatment Performed - Jet Perforation |
2011-09-26 | Well Fluid changed to Gas |
2011-09-26 | Well Mode changed to Testing |
2011-10-14 | Well Began Production |
2011-10-14 | Well Fluid changed to Gas |
2011-10-14 | Well Mode changed to Flowing |
2014-08-19 | Well Fluid changed to Gas |
2014-08-19 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-23 | 153.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-15 | Perforation | 3220.00 | 3220.60 | 10 |
2011-09-18 | Perforation | 3114.00 | 3114.60 | 10 |
2011-09-18 | Perforation | 3107.00 | 3107.60 | 10 |
2011-09-18 | Perforation | 3096.00 | 3096.60 | 10 |
2011-09-18 | Perforation | 3030.00 | 3030.90 | 10 |
2011-09-18 | Perforation | 3022.00 | 3023.20 | 10 |
2011-09-21 | Fracture | 3022.00 | 3117.90 | 0 |
2011-09-22 | Perforation | 2986.00 | 2986.90 | 10 |
2011-09-22 | Perforation | 2980.00 | 2980.90 | 10 |
2011-09-22 | Perforation | 2971.00 | 2971.60 | 10 |
2011-09-22 | Perforation | 2912.00 | 2913.20 | 10 |
2011-09-15 | Perforation | 3216.00 | 3216.90 | 10 |
2011-09-22 | Perforation | 2905.00 | 2905.90 | 10 |
2011-09-22 | Perforation | 2888.00 | 2888.30 | 10 |
2011-09-23 | Fracture | 2888.00 | 2986.90 | 0 |
2011-09-24 | Perforation | 2865.50 | 2866.70 | 10 |
2011-09-24 | Perforation | 2861.50 | 2862.70 | 10 |
2011-09-24 | Perforation | 2858.50 | 2859.10 | 10 |
2011-09-24 | Perforation | 2748.00 | 2748.90 | 10 |
2011-09-24 | Perforation | 2722.50 | 2723.40 | 10 |
2011-09-24 | Fracture | 2722.50 | 2866.70 | 0 |
2011-09-15 | Perforation | 3207.00 | 3207.60 | 10 |
2011-09-15 | Perforation | 3203.00 | 3203.60 | 10 |
2011-09-15 | Perforation | 3197.00 | 3197.90 | 10 |
2011-09-15 | Perforation | 3193.00 | 3193.30 | 10 |
2011-09-15 | Perforation | 3170.00 | 3170.90 | 10 |
2011-09-17 | Fracture | 3170.00 | 3220.60 | 0 |
2011-09-18 | Perforation | 3117.00 | 3117.90 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2204 | 0.0 | 0.0 | 0.0 |
2012 | 8512 | 0.0 | 0.0 | 0.0 |
2013 | 8555 | 0.0 | 0.0 | 0.0 |
2014 | 8558 | 0.0 | 0.0 | 0.0 |
2015 | 8575 | 0.0 | 0.0 | 0.0 |
2016 | 7986 | 0.0 | 0.0 | 0.0 |
2017 | 8688 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[6]