X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545210905020

Well Details

Well ID: 0545210905020
Loading map...
Location: 02/05-09-054-21W5/0
Location Alias: 02/05-09-54-21 W5M
Location Alias 2: 02/05-09-054-21 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 21
Section: 09
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ 102 SUNDANCE 5-9-54-21
Operator Name: Tourmaline Oil Corp.
License Number: 0493397
License Date: 2019-01-11
License Status: Issued
Spud Date: 2019-01-26
Final Drill Date: 2019-03-01
Well Total Depth: 4241.00 m
Surface Hole Latitude: 53.647147
Surface Hole Longitude: -117.021708

For data sources see[1][2]

Well History

Date Event
2019-01-11 Obtained License
2019-01-26 Direction Drilling Operation Performed - Deviate
2019-01-27 Surface Casing Operation Performed
2019-02-22 Intermediate Casing Operation Performed
2019-02-22 Lost Circulation Occurred
2019-02-25 Direction Drilling Operation Performed - Horizontal
2019-02-27 Well Log Performed
2019-03-01 Finished Drilling
2019-03-01 Well Log Performed
2019-03-01 Well Mode changed to Drilled and Cased
2019-03-02 Production Casing Operation Performed
2019-03-02 Well Began Production
2019-03-02 Well Fluid changed to Gas
2019-03-02 Well Mode changed to Flowing
2019-03-03 Rig Released
2019-03-14 Well Log Performed
2019-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-19 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-25 Nabors Drilling Canada Limited 77 N/A Resumption
2019-01-26 Nabors Drilling Canada Limited 77 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-26 107.10 Deviate (5 - 79 degrees)
2019-02-25 3085.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-18 Multi-Stage Fracture 4180.40 4180.50 0
2019-03-19 Multi-Stage Fracture 3715.50 3715.60 0
2019-03-19 Multi-Stage Fracture 3662.60 3662.70 0
2019-03-19 Multi-Stage Fracture 3609.70 3609.80 0
2019-03-19 Multi-Stage Fracture 3556.80 3556.90 0
2019-03-19 Multi-Stage Fracture 3503.90 3504.00 0
2019-03-19 Multi-Stage Fracture 3451.00 3451.10 0
2019-03-19 Multi-Stage Fracture 3398.20 3398.30 0
2019-03-19 Multi-Stage Fracture 3345.30 3345.40 0
2019-03-19 Multi-Stage Fracture 3292.40 3292.50 0
2019-03-19 Multi-Stage Fracture 3239.50 3239.60 0
2019-03-18 Multi-Stage Fracture 4138.60 4138.70 0
2019-03-19 Multi-Stage Fracture 3186.70 3186.80 0
2019-03-19 Multi-Stage Fracture 3146.40 3146.50 0
2019-03-18 Multi-Stage Fracture 4085.70 4085.80 0
2019-03-18 Multi-Stage Fracture 4032.90 4033.00 0
2019-03-18 Multi-Stage Fracture 3980.00 3980.10 0
2019-03-18 Multi-Stage Fracture 3927.10 3927.20 0
2019-03-18 Multi-Stage Fracture 3874.20 3874.30 0
2019-03-18 Multi-Stage Fracture 3821.30 3821.40 0
2019-03-19 Multi-Stage Fracture 3768.40 3768.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-18 2019-03-19 2,949 4,316 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.984 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.9347 N/A
silica crystalline 14808-60-7 100 3.9347 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.8838 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 2.0072 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0132 N/A
dibromoacetonitrile 3252-43-5 100 0.0132 N/A
non-hazardous ingredients Not Available 100 0.0132 N/A
polyethylene glycol 25322-68-3 100 0.0132 N/A
sodium bromide 7647-15-6 100 0.0132 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0898 N/A
water Not Available 100 0.0898 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0451 N/A
non-hazardous ingredients Not Available 100 0.0451 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0418 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0418 N/A
methanol 67-56-1 100 0.0418 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0418 N/A
non-hazardous ingredients Not Available 100 0.0418 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-14 2019-03-15 Recycled Fracturing Water (treated at well site) 670
2019-03-14 2019-03-17 Recycled Fracturing Water (treated at well site) 1600
2019-03-14 2019-03-16 Recycled Fracturing Water (treated at well site) 1879
2019-03-18 2019-03-19 Recycled Fracturing Water (treated at well site) 167

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6887 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-22 Lost Circulation 1460.00 1483.00
2019-03-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References