If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0545210609020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.633986,"lon":-117.083566,"icon":""}]} |
Location: 02/09-06-054-21W5/0 | |
Location Alias: 02/09-06-54-21 W5M | |
Location Alias 2: 02/09-06-054-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 5 | |
Range: 21 | |
Section: 06 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE SUNDANCE 9-6-54-21 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0413235 | |
License Date: 2009-10-20 | |
License Status: Issued | |
Spud Date: 2010-01-13 | |
Final Drill Date: 2010-01-27 | |
Well Total Depth: 3263.00 m | |
Surface Hole Latitude: 53.633986 | |
Surface Hole Longitude: -117.083566 |
Date | Event |
---|---|
2009-10-20 | Obtained License |
2010-01-14 | Direction Drilling Operation Performed - Deviate |
2010-01-15 | Surface Casing Operation Performed |
2010-01-27 | Finished Drilling |
2010-01-27 | Well Log Performed |
2010-01-27 | Well Mode changed to Drilled and Cased |
2010-01-28 | Production Casing Operation Performed |
2010-01-28 | Rig Released |
2010-02-10 | Perforation Treatment Performed - Jet Perforation |
2010-02-10 | Well Log Performed |
2010-02-11 | Perforation Treatment Performed - Fractured |
2010-02-15 | Perforation Treatment Performed - Jet Perforation |
2010-02-15 | Well Log Performed |
2010-02-16 | Perforation Treatment Performed - Fractured |
2010-02-16 | Perforation Treatment Performed - Jet Perforation |
2010-02-16 | Well Log Performed |
2010-02-17 | Perforation Treatment Performed - Fractured |
2010-02-17 | Perforation Treatment Performed - Jet Perforation |
2010-02-17 | Well Log Performed |
2010-02-18 | Perforation Treatment Performed - Fractured |
2010-04-09 | Well Began Production |
2010-04-09 | Well Fluid changed to Gas |
2010-04-09 | Well Mode changed to Flowing |
2011-06-02 | Well Fluid changed to Gas |
2011-06-02 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-01-14 | 344.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-10 | Perforation | 3247.00 | 3247.60 | 10 |
2010-02-16 | Perforation | 3056.00 | 3056.60 | 10 |
2010-02-16 | Perforation | 3046.00 | 3046.60 | 10 |
2010-02-16 | Perforation | 3036.00 | 3036.60 | 10 |
2010-02-16 | Fracture | 3036.00 | 3108.60 | 0 |
2010-02-16 | Perforation | 2949.00 | 2949.60 | 10 |
2010-02-16 | Perforation | 2940.00 | 2940.60 | 10 |
2010-02-16 | Perforation | 2932.00 | 2932.30 | 10 |
2010-02-16 | Perforation | 2924.00 | 2924.30 | 10 |
2010-02-16 | Perforation | 2912.00 | 2912.30 | 10 |
2010-02-16 | Perforation | 2897.00 | 2897.30 | 10 |
2010-02-10 | Perforation | 3241.00 | 3241.60 | 10 |
2010-02-16 | Perforation | 2886.50 | 2886.60 | 10 |
2010-02-17 | Fracture | 2886.50 | 2949.60 | 0 |
2010-02-17 | Perforation | 2748.00 | 2751.00 | 10 |
2010-02-18 | Fracture | 2748.00 | 2751.00 | 0 |
2010-02-10 | Perforation | 3231.00 | 3231.60 | 10 |
2010-02-10 | Perforation | 3224.00 | 3224.60 | 10 |
2010-02-10 | Perforation | 3212.00 | 3212.30 | 10 |
2010-02-10 | Perforation | 3147.50 | 3147.80 | 10 |
2010-02-11 | Fracture | 3147.50 | 3247.60 | 0 |
2010-02-15 | Perforation | 3108.00 | 3108.60 | 10 |
2010-02-15 | Perforation | 3067.00 | 3067.60 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 6367 | 0.0 | 0.0 | 0.0 |
2011 | 8602 | 0.0 | 0.0 | 0.0 |
2012 | 8625 | 0.0 | 0.0 | 0.0 |
2013 | 8439 | 0.0 | 0.0 | 0.0 |
2014 | 8335 | 0.0 | 0.0 | 0.0 |
2015 | 8461 | 0.0 | 0.0 | 0.0 |
2016 | 8329 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]