If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0545210601020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.633903,"lon":-117.083472,"icon":""}]} |
Location: 02/01-06-054-21W5/0 | |
Location Alias: 02/01-06-54-21 W5M | |
Location Alias 2: 02/01-06-054-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 5 | |
Range: 21 | |
Section: 06 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE SUNDANCE 1-6-54-21 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0413236 | |
License Date: 2009-10-20 | |
License Status: Issued | |
Spud Date: 2009-11-25 | |
Final Drill Date: 2009-12-20 | |
Well Total Depth: 3275.00 m | |
Surface Hole Latitude: 53.633903 | |
Surface Hole Longitude: -117.083472 |
Date | Event |
---|---|
2009-10-20 | Obtained License |
2009-11-26 | Surface Casing Operation Performed |
2009-11-29 | Direction Drilling Operation Performed - Deviate |
2009-12-20 | Finished Drilling |
2009-12-20 | Well Log Performed |
2009-12-20 | Well Mode changed to Drilled and Cased |
2009-12-21 | Production Casing Operation Performed |
2009-12-21 | Well Log Performed |
2009-12-22 | Rig Released |
2010-02-11 | Perforation Treatment Performed - Jet Perforation |
2010-02-11 | Well Log Performed |
2010-02-12 | Perforation Treatment Performed - Fractured |
2010-02-13 | Perforation Treatment Performed - Fractured |
2010-02-13 | Perforation Treatment Performed - Jet Perforation |
2010-02-13 | Well Log Performed |
2010-02-14 | Perforation Treatment Performed - Fractured |
2010-02-14 | Perforation Treatment Performed - Jet Perforation |
2010-02-14 | Well Log Performed |
2010-02-15 | Perforation Treatment Performed - Fractured |
2010-02-15 | Perforation Treatment Performed - Jet Perforation |
2010-02-15 | Well Log Performed |
2010-02-17 | Perforation Treatment Performed - Fractured |
2010-02-17 | Perforation Treatment Performed - Jet Perforation |
2010-02-17 | Well Log Performed |
2010-04-08 | Well Began Production |
2010-04-08 | Well Fluid changed to Gas |
2010-04-08 | Well Mode changed to Flowing |
2012-09-17 | Well Fluid changed to Gas |
2012-09-17 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-29 | 432.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-11 | Perforation | 3257.00 | 3257.30 | 10 |
2010-02-13 | Perforation | 3184.00 | 3184.60 | 10 |
2010-02-13 | Perforation | 3175.00 | 3175.60 | 10 |
2010-02-13 | Perforation | 3150.00 | 3150.30 | 10 |
2010-02-13 | Perforation | 3134.00 | 3134.30 | 10 |
2010-02-13 | Fracture | 3134.00 | 3223.30 | 0 |
2010-02-14 | Perforation | 3069.00 | 3069.60 | 10 |
2010-02-14 | Perforation | 3064.00 | 3064.30 | 10 |
2010-02-14 | Perforation | 3059.00 | 3059.60 | 10 |
2010-02-14 | Perforation | 3043.00 | 3043.30 | 10 |
2010-02-14 | Perforation | 3038.00 | 3038.60 | 10 |
2010-02-11 | Perforation | 3250.00 | 3250.90 | 10 |
2010-02-14 | Perforation | 3008.00 | 3008.60 | 10 |
2010-02-14 | Fracture | 3008.00 | 3069.60 | 0 |
2010-02-15 | Perforation | 2952.00 | 2952.60 | 10 |
2010-02-15 | Perforation | 2945.00 | 2945.60 | 10 |
2010-02-15 | Perforation | 2926.00 | 2926.30 | 10 |
2010-02-15 | Perforation | 2914.00 | 2914.30 | 10 |
2010-02-15 | Perforation | 2905.00 | 2905.60 | 10 |
2010-02-15 | Perforation | 2894.00 | 2894.30 | 10 |
2010-02-15 | Perforation | 2879.00 | 2879.30 | 10 |
2010-02-15 | Fracture | 2905.00 | 2952.60 | 0 |
2010-02-11 | Perforation | 3245.00 | 3245.60 | 10 |
2010-02-17 | Perforation | 2792.00 | 2793.00 | 10 |
2010-02-17 | Perforation | 2786.00 | 2787.00 | 10 |
2010-02-17 | Perforation | 2758.50 | 2759.50 | 10 |
2010-02-17 | Fracture | 2758.50 | 2793.00 | 0 |
2010-02-11 | Perforation | 3241.00 | 3241.60 | 10 |
2010-02-11 | Perforation | 3233.00 | 3233.60 | 10 |
2010-02-12 | Fracture | 3233.00 | 3257.30 | 0 |
2010-02-13 | Perforation | 3223.00 | 3223.30 | 10 |
2010-02-13 | Perforation | 3205.50 | 3206.10 | 10 |
2010-02-13 | Perforation | 3198.50 | 3198.80 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 6407 | 0.0 | 0.0 | 0.0 |
2011 | 7919 | 0.0 | 0.0 | 0.0 |
2012 | 7910 | 0.0 | 0.0 | 0.0 |
2013 | 8453 | 0.0 | 0.0 | 0.0 |
2014 | 8335 | 0.0 | 0.0 | 0.0 |
2015 | 8716 | 0.0 | 0.0 | 0.0 |
2016 | 8425 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]