If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545210316004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.642418,"lon":-117.002209,"icon":""}]} |
| Location: 00/16-03-054-21W5/4 | |
| Location Alias: 00/16-03-54-21 W5M | |
| Location Alias 2: 00/16-03-054-21 W5/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 21 | |
| Section: 03 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN SUNDAN 16-3-54-21 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0254842 | |
| License Date: 2001-05-09 | |
| License Status: Amended | |
| Spud Date: 2001-09-02 | |
| Final Drill Date: 2001-11-05 | |
| Well Total Depth: 3956.00 m | |
| Surface Hole Latitude: 53.642418 | |
| Surface Hole Longitude: -117.002209 |
| Date | Event |
|---|---|
| 2001-05-09 | Obtained License |
| 2001-09-07 | Surface Casing Operation Performed |
| 2001-09-13 | Lost Circulation Occurred |
| 2001-09-20 | Lost Circulation Occurred |
| 2001-10-16 | Well Log Performed |
| 2001-10-19 | Intermediate Casing Operation Performed |
| 2001-11-03 | Direction Drilling Operation Performed - Deviate |
| 2001-11-05 | Finished Drilling |
| 2001-11-05 | Well Mode changed to Drilled and Cased |
| 2001-11-06 | Well Log Performed |
| 2001-11-07 | Well Log Performed |
| 2001-11-11 | Liner Casing Operation Performed |
| 2001-11-14 | Rig Released |
| 2002-03-16 | Well Log Performed |
| 2002-03-20 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-20 | Well Log Performed |
| 2002-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-03-22 | Well Log Performed |
| 2002-03-23 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2002-03-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-03-24 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-30 | Well Log Performed |
| 2002-04-01 | Perforation Treatment Performed - Cement Squeeze |
| 2002-04-01 | Plug Back Performed |
| 2002-04-10 | Perforation Treatment Performed - Jet Perforation |
| 2002-04-10 | Well Log Performed |
| 2002-04-12 | Perforation Treatment Performed - Fractured |
| 2004-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-07-24 | Perforation Treatment Performed - Jet Perforation |
| 2004-07-26 | Perforation Treatment Performed - Fractured |
| 2004-08-06 | Perforation Treatment Performed - Jet Perforation |
| 2004-08-09 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2001-11-03 | 3830.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2002-03-20 | Perforation | 3837.50 | 3840.00 | 20 |
| 2004-07-22 | Packing Device Capped w/Cement | 3038.00 | 3042.00 | 0 |
| 2004-07-24 | Perforation | 2754.00 | 2758.00 | 20 |
| 2004-07-26 | Fracture | 2754.00 | 2758.00 | 0 |
| 2004-08-06 | Perforation | 2287.00 | 2291.00 | 20 |
| 2004-08-09 | Fracture | 2287.00 | 2291.00 | 0 |
| 2002-03-21 | Acid Treatment | 3837.50 | 3840.00 | 0 |
| 2002-03-23 | Hydra Jet Perforation | 3829.00 | 3832.00 | 20 |
| 2002-03-24 | Perforation | 3823.00 | 3829.00 | 20 |
| 2002-03-24 | Perforation | 3810.00 | 3818.00 | 20 |
| 2002-03-24 | Acid Treatment | 3810.00 | 3832.00 | 0 |
| 2002-04-01 | Cement Squeeze | 3810.00 | 3832.00 | 0 |
| 2002-04-10 | Perforation | 3054.00 | 3056.00 | 20 |
| 2002-04-12 | Fracture | 3054.00 | 3056.00 | 0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2001-09-13 | Lost Circulation | 1204.00 | 1210.00 |
| 2001-09-20 | Lost Circulation | 2624.00 | 2841.00 |
For data sources see[6]