X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545182516000

Well Details

Well ID: 0545182516000
Loading map...
Location: 00/16-25-054-18W5/0
Location Alias: 00/16-25-54-18 W5M
Location Alias 2: 00/16-25-054-18 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 18
Section: 25
County/Municipality: Yellowhead County
Well Name: LONG RUN HZ EDSON 16-25-54-18
Operator Name: Long Run Exploration Ltd.
License Number: 0442957
License Date: 2012-01-17
License Status: Issued
Spud Date: 2012-02-03
Final Drill Date: 2012-02-26
Well Total Depth: 3989.00 m
Surface Hole Latitude: 53.685861
Surface Hole Longitude: -116.503768

For data sources see[1][2]

Well History

Date Event
2012-01-17 Obtained License
2012-02-05 Surface Casing Operation Performed
2012-02-10 Direction Drilling Operation Performed - Horizontal
2012-02-14 Well Log Performed
2012-02-16 Intermediate Casing Operation Performed
2012-02-26 Finished Drilling
2012-02-26 Well Log Performed
2012-02-26 Well Mode changed to Drilled and Cased
2012-02-28 Liner Casing Operation Performed
2012-03-01 Rig Released
2012-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-14 Well Began Production
2012-03-14 Well Fluid changed to Gas
2012-03-14 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-03 Horizon Drilling Inc. 38 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-10 1964.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-09 Multi-Stage Fracture 3939.30 3975.40 0
2012-03-10 Multi-Stage Fracture 3185.20 3258.20 0
2012-03-11 Multi-Stage Fracture 3098.40 3185.20 0
2012-03-11 Multi-Stage Fracture 3011.20 3098.40 0
2012-03-11 Multi-Stage Fracture 2937.50 3011.20 0
2012-03-11 Multi-Stage Fracture 2850.50 2937.50 0
2012-03-11 Multi-Stage Fracture 2748.60 2850.50 0
2012-03-11 Multi-Stage Fracture 2715.80 2748.60 0
2012-03-09 Multi-Stage Fracture 3838.00 3939.30 0
2012-03-09 Multi-Stage Fracture 3753.80 3838.00 0
2012-03-09 Multi-Stage Fracture 3666.10 3753.80 0
2012-03-10 Multi-Stage Fracture 3592.30 3666.10 0
2012-03-10 Multi-Stage Fracture 3505.70 3592.30 0
2012-03-10 Multi-Stage Fracture 3432.30 3505.70 0
2012-03-10 Multi-Stage Fracture 3344.90 3432.40 0
2012-03-10 Multi-Stage Fracture 3258.20 3344.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5881 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8024 0.0 0.0 0.0
2016 8771 0.0 0.0 0.0
2017 8490 0.0 0.0 0.0
2018 8679 0.0 0.0 0.0
2019 7700 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[7]

References