If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545163015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.697822,"lon":-116.343719,"icon":""}]} |
| Location: 00/15-30-054-16W5/0 | |
| Location Alias: 00/15-30-54-16 W5M | |
| Location Alias 2: 00/15-30-054-16 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 16 | |
| Section: 30 | |
| County/Municipality: Yellowhead County | |
| Well Name: BURLINGTON ROSEVEAR 15-30-54-16 | |
| Operator Name: ConocoPhillips Canada Operations ULC | |
| License Number: 0244527 | |
| License Date: 2000-11-15 | |
| License Status: RecCertified | |
| Spud Date: 2000-11-21 | |
| Final Drill Date: 2000-12-06 | |
| Well Total Depth: 2545.00 m | |
| Surface Hole Latitude: 53.697822 | |
| Surface Hole Longitude: -116.343719 |
| Date | Event |
|---|---|
| 2000-11-15 | Obtained License |
| 2000-11-23 | Surface Casing Operation Performed |
| 2000-11-27 | Direction Drilling Operation Performed - Deviate |
| 2000-12-06 | Finished Drilling |
| 2000-12-06 | Well Log Performed |
| 2000-12-08 | Production Casing Operation Performed |
| 2000-12-08 | Rig Released |
| 2000-12-08 | Well Mode changed to Drilled and Cased |
| 2000-12-14 | Perforation Treatment Performed - Jet Perforation |
| 2000-12-14 | Well Log Performed |
| 2000-12-16 | Perforation Treatment Performed - Fractured |
| 2001-01-19 | Well Began Production |
| 2001-01-19 | Well Fluid changed to Crude Oil |
| 2001-01-19 | Well Mode changed to Pumping |
| 2001-06-30 | Well Fluid changed to Crude Oil |
| 2001-06-30 | Well Mode changed to Suspended |
| 2002-04-11 | Well Fluid changed to Crude Oil |
| 2002-04-11 | Well Mode changed to Pumping |
| 2005-03-05 | Well Log Performed |
| 2005-03-09 | Perforation Treatment Performed - Jet Perforation |
| 2005-03-10 | Perforation Treatment Performed - Fractured |
| 2006-11-16 | Well Fluid changed to Crude Oil |
| 2006-11-16 | Well Mode changed to Abandoned Zone |
| 2006-11-22 | Perforation Treatment Performed - Cement Plug |
| 2006-11-22 | Plug Back Performed |
| 2006-11-25 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2000-11-27 | 1800.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2000-12-14 | Perforation | 2347.00 | 2350.00 | 17 |
| 2000-12-16 | Fracture | 2347.00 | 2350.00 | 0 |
| 2005-03-09 | Perforation | 2402.00 | 2404.00 | 20 |
| 2005-03-10 | Fracture | 2402.00 | 2404.00 | 0 |
| 2006-11-22 | Cement Plug | 2293.00 | 2329.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 785 | 0.0 | 0.0 | 0.0 |
| 2002 | 6124 | 0.0 | 0.0 | 0.0 |
| 2003 | 1342 | 0.0 | 0.0 | 0.0 |
| 2005 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[6]