X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545161304000

Well Details

Well ID: 0545161304000
Loading map...
Location: 00/04-13-054-16W5/0
Location Alias: 00/04-13-54-16 W5M
Location Alias 2: 00/04-13-054-16 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 16
Section: 13
County/Municipality: Yellowhead County
Well Name: TORC HZ ROSEVEAR 4-13-54-16
Operator Name: TORC Oil & Gas Ltd.
License Number: 0480051
License Date: 2016-08-05
License Status: Amended
Spud Date: 2016-09-29
Final Drill Date: 2016-10-09
Well Total Depth: 3516.00 m
Surface Hole Latitude: 53.677044
Surface Hole Longitude: -116.238695

For data sources see[1][2]

Well History

Date Event
2016-08-05 Obtained License
2016-09-30 Surface Casing Operation Performed
2016-10-03 Direction Drilling Operation Performed - Deviate
2016-10-03 Direction Drilling Operation Performed - Horizontal
2016-10-04 Intermediate Casing Operation Performed
2016-10-09 Finished Drilling
2016-10-09 Well Log Performed
2016-10-09 Well Mode changed to Drilled and Cased
2016-10-11 Liner Casing Operation Performed
2016-10-11 Rig Released
2016-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-17 Well Began Production
2016-11-17 Well Fluid changed to Crude Oil
2016-11-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-29 Trinidad Drilling Ltd. 31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-10-03 1375.00 Deviate (5 - 79 degrees)
2016-10-03 1741.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-30 Multi-Stage Fracture 3488.00 3501.00 0
2016-10-30 Multi-Stage Fracture 2981.90 2982.00 0
2016-10-30 Multi-Stage Fracture 2941.90 2942.00 0
2016-10-30 Multi-Stage Fracture 2874.10 2874.20 0
2016-10-30 Multi-Stage Fracture 2832.50 2832.60 0
2016-10-30 Multi-Stage Fracture 2804.30 2804.40 0
2016-10-30 Multi-Stage Fracture 2751.40 2751.50 0
2016-10-30 Multi-Stage Fracture 2698.00 2698.10 0
2016-10-30 Multi-Stage Fracture 2644.50 2644.60 0
2016-10-30 Multi-Stage Fracture 2591.10 2591.20 0
2016-10-30 Multi-Stage Fracture 2536.10 2536.20 0
2016-10-30 Multi-Stage Fracture 3433.50 3433.60 0
2016-10-30 Multi-Stage Fracture 2470.70 2470.80 0
2016-10-30 Multi-Stage Fracture 2417.50 2417.60 0
2016-10-30 Multi-Stage Fracture 2364.50 2364.60 0
2016-10-30 Multi-Stage Fracture 2312.60 2312.70 0
2016-10-30 Multi-Stage Fracture 2217.40 2217.50 0
2016-10-30 Multi-Stage Fracture 2175.90 2176.00 0
2016-10-30 Multi-Stage Fracture 3384.70 3385.80 0
2016-10-30 Multi-Stage Fracture 3336.40 3336.50 0
2016-10-30 Multi-Stage Fracture 3281.50 3281.60 0
2016-10-30 Multi-Stage Fracture 3218.90 3219.00 0
2016-10-30 Multi-Stage Fracture 3141.30 3141.40 0
2016-10-30 Multi-Stage Fracture 3059.40 3059.50 0
2016-10-30 Multi-Stage Fracture 3021.60 3021.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-30 2016-10-30 1,632 3,537 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.2291 N/A
Sand (30/50) Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.1195 N/A
Crystalline silica. quartz 14808-60-7 100 3.1195 N/A
Iron Oxide 1309-37-1 100 3.1195 N/A
Titanium Oxide 13463-67-7 100 3.1195 N/A
Sand (40/70) Canyon Technical Services Aluminum Oxide 1344-28-1 100 9.3586 N/A
Crystalline silica. quartz 14808-60-7 100 9.3586 N/A
Iron Oxide 1309-37-1 100 9.3586 N/A
Titanium Oxide 13463-67-7 100 9.3586 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.0055 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.0055 N/A
CAN-1911 Clay Stabilizer Canyon Technical Services Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0947 N/A
Water 7732-18-5 100 0.0947 N/A
CAN-2411 Non-emulsifier Canyon Technical Services Demulsifier Ethylene glycol 107-21-1 100 0.0434 N/A
Isopropanol 67-63-0 100 0.0434 N/A
Water 7732-18-5 100 0.0434 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.1053 N/A
CAN-2403 nanoFLO Canyon Technical Services Surfactant Ethanol 64-17-5 100 0.0433 N/A
Methanol 67-56-1 100 0.0433 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0433 N/A
Water 7732-18-5 100 0.0433 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-24 2016-10-26 Surface Water - Lake 3915

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1067 0.0 0.0 0.0
2017 7947 0.0 0.0 0.0
2018 8389 0.0 0.0 0.0
2019 8537 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-11 No Incident Encountered 0.00 0.00
2016-11-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References