If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545150101000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.642281,"lon":-116.068674,"icon":""}]} |
| Location: 00/01-01-054-15W5/0 | |
| Location Alias: 00/01-01-54-15 W5M | |
| Location Alias 2: 00/01-01-054-15 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 15 | |
| Section: 01 | |
| County/Municipality: Yellowhead County | |
| Well Name: BONAVISTA HZ CARROT 1-1-54-15 | |
| Operator Name: Bonavista Energy Corporation | |
| License Number: 0426122 | |
| License Date: 2010-11-22 | |
| License Status: Issued | |
| Spud Date: 2011-01-13 | |
| Final Drill Date: 2011-01-30 | |
| Well Total Depth: 3410.00 m | |
| Surface Hole Latitude: 53.642281 | |
| Surface Hole Longitude: -116.068674 |
| Date | Event |
|---|---|
| 2010-11-22 | Obtained License |
| 2011-01-14 | Surface Casing Operation Performed |
| 2011-01-20 | Direction Drilling Operation Performed - Horizontal |
| 2011-01-24 | Intermediate Casing Operation Performed |
| 2011-01-24 | Well Log Performed |
| 2011-01-30 | Finished Drilling |
| 2011-01-30 | Well Mode changed to Drilled and Cased |
| 2011-02-02 | Liner Casing Operation Performed |
| 2011-02-02 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-02-02 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2011-02-02 | Rig Released |
| 2011-02-09 | Well Log Performed |
| 2011-02-13 | Perforation Treatment Performed - Fractured |
| 2011-03-22 | Well Began Production |
| 2011-03-22 | Well Fluid changed to Gas |
| 2011-03-22 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-01-20 | 2063.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-02 | Open Hole/Barefoot Completion | 2300.00 | 3410.00 | 0 |
| 2011-02-02 | Slotted Liner | 2300.00 | 3405.00 | 0 |
| 2011-02-13 | Fracture | 2366.30 | 3356.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6086 | 0.0 | 0.0 | 0.0 |
| 2012 | 8586 | 0.0 | 0.0 | 0.0 |
| 2013 | 8453 | 0.0 | 0.0 | 0.0 |
| 2014 | 8416 | 0.0 | 0.0 | 0.0 |
| 2015 | 8752 | 0.0 | 0.0 | 0.0 |
| 2016 | 8558 | 0.0 | 0.0 | 0.0 |
| 2017 | 8052 | 0.0 | 0.0 | 0.0 |
| 2018 | 8629 | 0.0 | 0.0 | 0.0 |
| 2019 | 8213 | 0.0 | 0.0 | 0.0 |
| 2020 | 2144 | 0.0 | 0.0 | 0.0 |
For data sources see[6]