If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0544260103002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.630745,"lon":-113.704313,"icon":""}]} |
Location: 00/03-01-054-26W4/2 | |
Location Alias: 00/03-01-54-26 W4M | |
Location Alias 2: 00/03-01-054-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 4 | |
Range: 26 | |
Section: 01 | |
County/Municipality: St. Albert | |
Well Name: DAYLIGHT STAL-BLK 3-1-54-26 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0005507 | |
License Date: 1952-10-18 | |
License Status: Abandoned | |
Spud Date: 1952-10-31 | |
Final Drill Date: 1952-12-22 | |
Well Total Depth: 1445.70 m | |
Surface Hole Latitude: 53.630745 | |
Surface Hole Longitude: -113.704313 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-10-18 | Obtained License |
1952-11-09 | Drill Stem Test Performed |
1952-11-10 | Drill Stem Test Performed |
1952-11-16 | Drill Stem Test Performed |
1952-11-18 | Drill Stem Test Performed |
1952-11-19 | Drill Stem Test Performed |
1952-11-20 | Drill Stem Test Performed |
1952-11-21 | Drill Stem Test Performed |
1952-11-22 | Drill Stem Test Performed |
1952-11-23 | Drill Stem Test Performed |
1952-11-25 | Drill Stem Test Performed |
1952-11-27 | Drill Stem Test Performed |
1952-11-29 | Drill Stem Test Performed |
1952-12-03 | Drill Stem Test Performed |
1952-12-04 | Drill Stem Test Performed |
1952-12-11 | Production Casing Operation Performed |
1952-12-17 | Drill Stem Test Performed |
1952-12-22 | Finished Drilling |
1952-12-22 | Well Mode changed to Drilled and Cased |
1952-12-27 | Perforation Treatment Performed - Open-Hole Completion |
1983-07-24 | Well Log Performed |
1992-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-17 | Plug Back Performed |
1992-06-17 | Well Log Performed |
1992-06-18 | Perforation Treatment Performed - Jet Perforation |
1992-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-06-22 | Well Began Production |
1992-06-22 | Well Fluid changed to Crude Oil |
1992-06-22 | Well Mode changed to Pumping |
1995-03-02 | Well Log Performed |
1997-11-26 | Well Fluid changed to Crude Oil |
1997-11-26 | Well Mode changed to Suspended |
1998-01-20 | Well Log Performed |
1998-01-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-02-01 | Perforation Treatment Performed - Jet Perforation |
1998-02-01 | Well Log Performed |
1998-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-02-11 | Well Log Performed |
1998-02-12 | Perforation Treatment Performed - Jet Perforation |
1998-02-12 | Well Log Performed |
1998-02-22 | Perforation Treatment Performed - Jet Perforation |
1998-02-22 | Well Log Performed |
1998-02-26 | Perforation Treatment Performed - Remedial Casing |
1998-03-02 | Perforation Treatment Performed - Jet Perforation |
1998-03-02 | Well Log Performed |
1998-03-14 | Perforation Treatment Performed - Jet Perforation |
1998-10-24 | Well Log Performed |
1998-10-26 | Well Log Performed |
1998-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-11-05 | Perforation Treatment Performed - Cement Plug |
1998-11-05 | Plug Back Performed |
1998-11-05 | Well Abandoned |
1998-11-05 | Well Fluid changed to Crude Oil |
1998-11-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-12-27 | Open Hole/Barefoot Completion | 1379.20 | 1435.60 | 0 |
1998-02-26 | Remedial Casing Cementing | 1055.80 | 1058.50 | 0 |
1998-03-02 | Perforation | 1047.00 | 1051.00 | 13 |
1998-03-14 | Perforation | 1020.00 | 1022.00 | 14 |
1998-03-14 | Perforation | 1025.50 | 1028.00 | 14 |
1998-11-04 | Packing Device Capped w/Cement | 1059.00 | 1067.00 | 0 |
1998-11-05 | Packing Device Capped w/Cement | 775.00 | 1050.00 | 0 |
1998-11-05 | Cement Plug | 250.00 | 475.00 | 0 |
1998-11-05 | Cement Plug | 1.00 | 184.00 | 0 |
1992-06-17 | Packing Device Capped w/Cement | 1365.00 | 1373.00 | 0 |
1992-06-18 | Perforation | 1319.80 | 1320.70 | 13 |
1992-06-22 | Acid Treatment | 1319.80 | 1320.70 | 0 |
1998-01-25 | Packing Device Capped w/Cement | 1303.00 | 1311.00 | 0 |
1998-02-01 | Perforation | 1161.00 | 1164.00 | 13 |
1998-02-11 | Packing Device Capped w/Cement | 1151.00 | 1159.00 | 0 |
1998-02-12 | Perforation | 1068.50 | 1074.00 | 13 |
1998-02-22 | Perforation | 1055.80 | 1058.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 3305 | 0.0 | 0.0 | 0.0 |
1993 | 8330 | 0.0 | 0.0 | 0.0 |
1994 | 7621 | 0.0 | 0.0 | 0.0 |
1995 | 6408 | 0.0 | 0.0 | 0.0 |
1996 | 1250 | 0.0 | 0.0 | 0.0 |
For data sources see[5]