X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544260103002

Well Details

Well ID: 0544260103002
Loading map...
Location: 00/03-01-054-26W4/2
Location Alias: 00/03-01-54-26 W4M
Location Alias 2: 00/03-01-054-26 W4/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 26
Section: 01
County/Municipality: St. Albert
Well Name: DAYLIGHT STAL-BLK 3-1-54-26
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0005507
License Date: 1952-10-18
License Status: Abandoned
Spud Date: 1952-10-31
Final Drill Date: 1952-12-22
Well Total Depth: 1445.70 m
Surface Hole Latitude: 53.630745
Surface Hole Longitude: -113.704313

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-10-18 Obtained License
1952-11-09 Drill Stem Test Performed
1952-11-10 Drill Stem Test Performed
1952-11-16 Drill Stem Test Performed
1952-11-18 Drill Stem Test Performed
1952-11-19 Drill Stem Test Performed
1952-11-20 Drill Stem Test Performed
1952-11-21 Drill Stem Test Performed
1952-11-22 Drill Stem Test Performed
1952-11-23 Drill Stem Test Performed
1952-11-25 Drill Stem Test Performed
1952-11-27 Drill Stem Test Performed
1952-11-29 Drill Stem Test Performed
1952-12-03 Drill Stem Test Performed
1952-12-04 Drill Stem Test Performed
1952-12-11 Production Casing Operation Performed
1952-12-17 Drill Stem Test Performed
1952-12-22 Finished Drilling
1952-12-22 Well Mode changed to Drilled and Cased
1952-12-27 Perforation Treatment Performed - Open-Hole Completion
1983-07-24 Well Log Performed
1992-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-17 Plug Back Performed
1992-06-17 Well Log Performed
1992-06-18 Perforation Treatment Performed - Jet Perforation
1992-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-22 Well Began Production
1992-06-22 Well Fluid changed to Crude Oil
1992-06-22 Well Mode changed to Pumping
1995-03-02 Well Log Performed
1997-11-26 Well Fluid changed to Crude Oil
1997-11-26 Well Mode changed to Suspended
1998-01-20 Well Log Performed
1998-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-01 Perforation Treatment Performed - Jet Perforation
1998-02-01 Well Log Performed
1998-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-11 Well Log Performed
1998-02-12 Perforation Treatment Performed - Jet Perforation
1998-02-12 Well Log Performed
1998-02-22 Perforation Treatment Performed - Jet Perforation
1998-02-22 Well Log Performed
1998-02-26 Perforation Treatment Performed - Remedial Casing
1998-03-02 Perforation Treatment Performed - Jet Perforation
1998-03-02 Well Log Performed
1998-03-14 Perforation Treatment Performed - Jet Perforation
1998-10-24 Well Log Performed
1998-10-26 Well Log Performed
1998-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-05 Perforation Treatment Performed - Cement Plug
1998-11-05 Plug Back Performed
1998-11-05 Well Abandoned
1998-11-05 Well Fluid changed to Crude Oil
1998-11-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-12-27 Open Hole/Barefoot Completion 1379.20 1435.60 0
1998-02-26 Remedial Casing Cementing 1055.80 1058.50 0
1998-03-02 Perforation 1047.00 1051.00 13
1998-03-14 Perforation 1020.00 1022.00 14
1998-03-14 Perforation 1025.50 1028.00 14
1998-11-04 Packing Device Capped w/Cement 1059.00 1067.00 0
1998-11-05 Packing Device Capped w/Cement 775.00 1050.00 0
1998-11-05 Cement Plug 250.00 475.00 0
1998-11-05 Cement Plug 1.00 184.00 0
1992-06-17 Packing Device Capped w/Cement 1365.00 1373.00 0
1992-06-18 Perforation 1319.80 1320.70 13
1992-06-22 Acid Treatment 1319.80 1320.70 0
1998-01-25 Packing Device Capped w/Cement 1303.00 1311.00 0
1998-02-01 Perforation 1161.00 1164.00 13
1998-02-11 Packing Device Capped w/Cement 1151.00 1159.00 0
1998-02-12 Perforation 1068.50 1074.00 13
1998-02-22 Perforation 1055.80 1058.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3305 0.0 0.0 0.0
1993 8330 0.0 0.0 0.0
1994 7621 0.0 0.0 0.0
1995 6408 0.0 0.0 0.0
1996 1250 0.0 0.0 0.0

For data sources see[5]

References