X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544253111030

Well Details

Well ID: 0544253111030
Loading map...
Location: 03/11-31-054-25W4/0
Location Alias: 03/11-31-54-25 W4M
Location Alias 2: 03/11-31-054-25 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 25
Section: 31
County/Municipality: Sturgeon County
Well Name: CEDAR CREEK MORINV 11-31-54-25
Operator Name: MAGA Energy Operations Ltd.
License Number: 0216619
License Date: 1998-07-22
License Status: Suspension
Spud Date: 1998-09-10
Final Drill Date: 1998-09-15
Well Total Depth: 1192.00 m
Surface Hole Latitude: 53.710550
Surface Hole Longitude: -113.679088

For data sources see[1][2]

Well History

Date Event
1998-07-22 Obtained License
1998-09-11 Surface Casing Operation Performed
1998-09-15 Direction Drilling Operation Performed - Deviate
1998-09-15 Finished Drilling
1998-09-15 Production Casing Operation Performed
1998-09-15 Well Log Performed
1998-09-16 Rig Released
1998-09-22 Well Log Performed
1998-09-23 Perforation Treatment Performed - Jet Perforation
1998-09-23 Well Log Performed
1998-09-26 Well Mode changed to Drilled and Cased
2001-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-11 Plug Back Performed
2001-02-11 Well Mode changed to Abandoned Zone
2001-02-12 Perforation Treatment Performed - Jet Perforation
2003-06-17 Perforation Treatment Performed - Cement Squeeze
2003-06-17 Plug Back Performed
2003-06-25 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-09-15 787.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-09-23 Perforation 1157.00 1160.00 17
1998-09-23 Perforation 1162.00 1163.00 17
2001-02-11 Packing Device Capped w/Cement 1157.00 1163.00 0
2001-02-12 Perforation 1087.00 1088.20 18
2003-06-17 Cement Squeeze 1087.00 1088.20 0
2003-06-25 Perforation 1145.00 1147.00 17

For data sources see[5]



References