If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0544251614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.670741,"lon":-113.630281,"icon":""}]} |
| Location: 00/14-16-054-25W4/0 | |
| Location Alias: 00/14-16-54-25 W4M | |
| Location Alias 2: 00/14-16-054-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 16 | |
| County/Municipality: St. Albert | |
| Well Name: TRANS EMPIRE CAMPBELL NO. 21 | |
| Operator Name: Taylor Petroleum Operators Limited | |
| License Number: 0003825 | |
| License Date: 1951-11-21 | |
| License Status: RecExempt | |
| Spud Date: 1951-12-01 | |
| Final Drill Date: 1951-12-19 | |
| Well Total Depth: 1463.60 m | |
| Surface Hole Latitude: 53.670741 | |
| Surface Hole Longitude: -113.630281 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1951-11-21 | Obtained License |
| 1951-12-14 | Drill Stem Test Performed |
| 1951-12-15 | Drill Stem Test Performed |
| 1951-12-18 | Drill Stem Test Performed |
| 1951-12-19 | Finished Drilling |
| 1951-12-19 | Well Mode changed to Drilled and Cased |
| 1951-12-20 | Production Casing Operation Performed |
| 1951-12-27 | Perforation Treatment Performed - Bullet Perforation |
| 1951-12-29 | Perforation Treatment Performed - Bullet Perforation |
| 1951-12-31 | Perforation Treatment Performed - Cement Squeeze |
| 1952-01-03 | Perforation Treatment Performed - Bullet Perforation |
| 1952-01-04 | Perforation Treatment Performed - Cement Squeeze |
| 1952-01-07 | Perforation Treatment Performed - Bullet Perforation |
| 1952-01-12 | Perforation Treatment Performed - Bullet Perforation |
| 1952-01-15 | Perforation Treatment Performed - Cement Squeeze |
| 1952-01-18 | Perforation Treatment Performed - Bullet Perforation |
| 1952-06-10 | Perforation Treatment Performed - Jet Perforation |
| 1952-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1952-06-23 | Perforation Treatment Performed - Jet Perforation |
| 1952-06-25 | Perforation Treatment Performed - Jet Perforation |
| 1952-06-27 | Perforation Treatment Performed - Bullet Perforation |
| 1952-07-10 | Perforation Treatment Performed - Bullet Perforation |
| 1952-07-10 | Perforation Treatment Performed - Jet Perforation |
| 1952-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1952-07-16 | Perforation Treatment Performed - Bullet Perforation |
| 1952-07-16 | Perforation Treatment Performed - Jet Perforation |
| 1952-07-25 | Well Began Production |
| 1952-07-25 | Well Fluid changed to Crude Oil |
| 1952-07-25 | Well Mode changed to Pumping |
| 1952-11-14 | Well Fluid changed to Crude Oil |
| 1952-11-14 | Well Mode changed to Suspended |
| 1953-03-01 | Perforation Treatment Performed - Bullet Perforation |
| 1953-03-11 | Perforation Treatment Performed - Cement Plug |
| 1954-12-20 | Well Abandoned |
| 1954-12-20 | Well Fluid changed to Crude Oil |
| 1954-12-20 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1951-12-27 | Bullet Perforation | 1150.90 | 1151.20 | 13 |
| 1952-06-10 | Perforation | 1145.70 | 1146.00 | 13 |
| 1952-06-23 | Packing Device Capped w/Cement | 1143.60 | 1143.60 | 0 |
| 1952-06-23 | Perforation | 1142.40 | 1143.00 | 13 |
| 1952-06-25 | Perforation | 1136.60 | 1137.20 | 13 |
| 1952-06-27 | Bullet Perforation | 1136.60 | 1137.50 | 13 |
| 1952-07-10 | Perforation | 1135.70 | 1137.80 | 13 |
| 1952-07-10 | Bullet Perforation | 1135.70 | 1137.80 | 26 |
| 1952-07-16 | Packing Device Capped w/Cement | 1133.60 | 1133.60 | 0 |
| 1952-07-16 | Bullet Perforation | 1129.90 | 1132.90 | 13 |
| 1952-07-16 | Perforation | 1129.90 | 1132.90 | 13 |
| 1951-12-29 | Bullet Perforation | 1145.10 | 1145.40 | 13 |
| 1953-03-01 | Bullet Perforation | 1143.00 | 1158.20 | 0 |
| 1953-03-11 | Cement Plug | 1127.80 | 1173.50 | 0 |
| 1951-12-31 | Cement Squeeze | 1145.10 | 1151.20 | 0 |
| 1952-01-03 | Bullet Perforation | 1148.80 | 1149.10 | 0 |
| 1952-01-04 | Cement Squeeze | 1148.80 | 1149.10 | 0 |
| 1952-01-07 | Bullet Perforation | 1148.80 | 1149.10 | 13 |
| 1952-01-12 | Bullet Perforation | 1148.50 | 1148.80 | 13 |
| 1952-01-15 | Cement Squeeze | 1148.50 | 1149.10 | 0 |
| 1952-01-18 | Bullet Perforation | 1148.20 | 1148.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]