X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535250705000

Well Details

Well ID: 0535250705000
Loading map...
Location: 00/05-07-053-25W5/0
Location Alias: 00/05-07-53-25 W5M
Location Alias 2: 00/05-07-053-25 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 25
Section: 07
County/Municipality: Yellowhead County
Well Name: FAIRBORNE ET AL MARSH 5-7-53-25
Operator Name: Tourmaline Oil Corp.
License Number: 0330700
License Date: 2005-05-10
License Status: Suspension
Spud Date: 2005-08-03
Final Drill Date: 2005-10-30
Well Total Depth: 3835.00 m
Surface Hole Latitude: 53.559927
Surface Hole Longitude: -117.685248

For data sources see[1][2]

Well History

Date Event
2005-05-10 Obtained License
2005-08-07 Surface Casing Operation Performed
2005-08-10 Lost Circulation Occurred
2005-09-17 Direction Drilling Operation Performed - Deviate
2005-09-19 Well Log Performed
2005-09-22 Intermediate Casing Operation Performed
2005-10-30 Finished Drilling
2005-10-30 Well Log Performed
2005-10-30 Well Mode changed to Drilled and Cased
2005-11-01 Well Log Performed
2005-11-05 Liner Casing Operation Performed
2005-11-08 Rig Released
2005-12-01 Well Log Performed
2005-12-04 Perforation Treatment Performed - Jet Perforation
2005-12-04 Well Log Performed
2005-12-18 Perforation Treatment Performed - Fractured
2005-12-19 Well Log Performed
2005-12-20 Perforation Treatment Performed - Fractured
2005-12-20 Perforation Treatment Performed - Jet Perforation
2017-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-20 Plug Back Performed
2017-08-20 Well Mode changed to Abandoned Zone
2017-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-21 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-09-17 2981.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-04 Perforation 3768.00 3771.00 17
2005-12-18 Fracture 3768.00 3771.00 0
2005-12-20 Perforation 3076.00 3077.00 4
2005-12-20 Perforation 3057.00 3058.00 4
2005-12-20 Fracture 3057.00 3077.00 0
2017-08-20 Packing Device Capped w/Cement 3746.00 3754.00 0
2017-08-21 Packing Device Capped w/Cement 3040.00 3048.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-08-10 Lost Circulation 1338.00 1804.00
2017-08-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References