X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535240305020

Well Details

Well ID: 0535240305020
Loading map...
Location: 02/05-03-053-24W5/0
Location Alias: 02/05-03-53-24 W5M
Location Alias 2: 02/05-03-053-24 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 24
Section: 03
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ 102 DALEHST 5-3-53-24
Operator Name: Tourmaline Oil Corp.
License Number: 0476154
License Date: 2015-07-17
License Status: Issued
Spud Date: 2015-10-13
Final Drill Date: 2015-11-04
Well Total Depth: 4973.00 m
Surface Hole Latitude: 53.556137
Surface Hole Longitude: -117.441465

For data sources see[1][2]

Well History

Date Event
2015-07-17 Obtained License
2015-10-14 Surface Casing Operation Performed
2015-10-22 Intermediate Casing Operation Performed
2015-10-26 Direction Drilling Operation Performed - Deviate
2015-10-29 Direction Drilling Operation Performed - Horizontal
2015-11-04 Finished Drilling
2015-11-04 Well Log Performed
2015-11-04 Well Mode changed to Drilled and Cased
2015-11-05 Well Log Performed
2015-11-07 Production Casing Operation Performed
2015-11-08 Rig Released
2015-11-13 Well Log Performed
2015-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-18 Well Began Production
2015-11-18 Well Fluid changed to Gas
2015-11-18 Well Mode changed to Flowing
2015-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-20 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-10-13 Dc Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-10-26 3020.40 Deviate (5 - 79 degrees)
2015-10-29 3428.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-15 Multi-Stage Fracture 4916.60 4916.70 0
2015-11-19 Multi-Stage Fracture 4388.70 4388.80 0
2015-11-19 Multi-Stage Fracture 4335.80 4335.90 0
2015-11-19 Multi-Stage Fracture 4257.60 4257.70 0
2015-11-19 Multi-Stage Fracture 4154.00 4154.10 0
2015-11-19 Multi-Stage Fracture 4063.50 4063.60 0
2015-11-19 Multi-Stage Fracture 4010.60 4010.70 0
2015-11-19 Multi-Stage Fracture 3957.70 3957.80 0
2015-11-19 Multi-Stage Fracture 3904.90 3905.00 0
2015-11-19 Multi-Stage Fracture 3852.00 3852.10 0
2015-11-19 Multi-Stage Fracture 3799.10 3799.20 0
2015-11-18 Multi-Stage Fracture 4862.50 4862.60 0
2015-11-20 Multi-Stage Fracture 3746.20 3746.30 0
2015-11-20 Multi-Stage Fracture 3693.30 3693.40 0
2015-11-20 Multi-Stage Fracture 3640.40 3640.50 0
2015-11-20 Multi-Stage Fracture 3587.60 3587.70 0
2015-11-20 Multi-Stage Fracture 3534.80 3534.90 0
2015-11-20 Multi-Stage Fracture 3481.90 3482.00 0
2015-11-18 Multi-Stage Fracture 4809.70 4809.80 0
2015-11-18 Multi-Stage Fracture 4756.80 4756.90 0
2015-11-18 Multi-Stage Fracture 4703.90 4704.00 0
2015-11-18 Multi-Stage Fracture 4651.10 4651.20 0
2015-11-18 Multi-Stage Fracture 4572.80 4572.90 0
2015-11-19 Multi-Stage Fracture 4494.60 4494.70 0
2015-11-19 Multi-Stage Fracture 4441.60 4441.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-15 2015-11-20 3,325 5,787 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.5587 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 5.6972 N/A
silica crystalline 14808-60-7 100 5.6972 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 8.4161 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.9686 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0135 N/A
dibromoacetonitrile 3252-43-5 100 0.0135 N/A
non-hazardous ingredients Not Available 100 0.0135 N/A
polyethylene glycol 25322-68-3 100 0.0135 N/A
sodium bromide 7647-15-6 100 0.0135 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1601 N/A
water Not Available 100 0.1601 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.1076 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.1076 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.1076 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1075 N/A
non-hazardous ingredients Not Available 100 0.1075 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0779 N/A
isopropanol 67-63-0 100 0.0779 N/A
methanol 67-56-1 100 0.0779 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0779 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0779 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-15 2015-11-17 Surface Water - Runoff 3867
2015-11-18 2015-11-19 Recycled Fracturing Water (treated at well site) 1135
2015-11-13 2015-11-13 Recycled Fracturing Water (treated at well site) 90
2015-11-18 2015-11-20 Recycled Fracturing Water (treated at well site) 695

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1008 0.0 0.0 0.0
2016 8549 0.0 0.0 0.0
2017 8114 0.0 0.0 0.0
2018 8570 0.0 0.0 0.0
2019 8222 0.0 0.0 0.0
2020 1352 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-11-04 No Incident Encountered 0.00 0.00
2015-11-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References