X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535231814020

Well Details

Well ID: 0535231814020
Loading map...
Location: 02/14-18-053-23W5/0
Location Alias: 02/14-18-53-23 W5M
Location Alias 2: 02/14-18-053-23 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 23
Section: 18
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ 02 DALEHST 14-18-53-23
Operator Name: Tourmaline Oil Corp.
License Number: 0496081
License Date: 2019-10-17
License Status: Issued
Spud Date: 2019-11-13
Final Drill Date: 2019-11-29
Well Total Depth: 4907.00 m
Surface Hole Latitude: 53.567308
Surface Hole Longitude: -117.371995

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-11-13 Nabors Drilling Canada Limited 58AC Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-11-24 2909.40 Deviate (5 - 79 degrees)
2019-11-27 3302.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-12-09 Multi-Stage Fracture 4854.40 4854.50 0
2019-12-10 Multi-Stage Fracture 4393.80 4393.90 0
2019-12-10 Multi-Stage Fracture 4341.80 4341.90 0
2019-12-10 Multi-Stage Fracture 4289.30 4289.40 0
2019-12-10 Multi-Stage Fracture 4236.40 4236.50 0
2019-12-10 Multi-Stage Fracture 4183.90 4184.00 0
2019-12-10 Multi-Stage Fracture 4131.30 4131.40 0
2019-12-10 Multi-Stage Fracture 4079.00 4079.10 0
2019-12-10 Multi-Stage Fracture 4026.40 4026.50 0
2019-12-11 Multi-Stage Fracture 3974.60 3974.70 0
2019-12-11 Multi-Stage Fracture 3922.10 3922.20 0
2019-12-10 Multi-Stage Fracture 4812.60 4812.70 0
2019-12-11 Multi-Stage Fracture 3870.30 3870.40 0
2019-12-11 Multi-Stage Fracture 3818.10 3818.20 0
2019-12-11 Multi-Stage Fracture 3765.40 3765.50 0
2019-12-11 Multi-Stage Fracture 3713.70 3713.80 0
2019-12-11 Multi-Stage Fracture 3661.40 3661.50 0
2019-12-11 Multi-Stage Fracture 3609.10 3609.20 0
2019-12-11 Multi-Stage Fracture 3557.40 3557.50 0
2019-12-11 Multi-Stage Fracture 3505.40 3505.50 0
2019-12-11 Multi-Stage Fracture 3452.70 3452.80 0
2019-12-11 Multi-Stage Fracture 3400.60 3400.70 0
2019-12-10 Multi-Stage Fracture 4761.00 4761.10 0
2019-12-11 Multi-Stage Fracture 3348.20 3348.30 0
2019-12-10 Multi-Stage Fracture 4708.20 4708.30 0
2019-12-10 Multi-Stage Fracture 4655.20 4655.30 0
2019-12-10 Multi-Stage Fracture 4602.70 4602.80 0
2019-12-10 Multi-Stage Fracture 4550.30 4550.40 0
2019-12-10 Multi-Stage Fracture 4498.70 4498.80 0
2019-12-10 Multi-Stage Fracture 4446.30 4446.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-12-09 2019-12-11 3,192 6,202 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.9297 N/A
Sand - Tier 1 40/70 Trican silica crystalline 14808-60-7 100 11.8994 N/A
Sand - Tier 2 50/140 Trican silica crystalline 14808-60-7 100 2.0086 N/A
WayProp (40/70) Trican phenolic resin 9003-35-4 100 3.9664 N/A
silica crystalline 14808-60-7 100 3.9664 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.011 N/A
dibromoacetonitrile 3252-43-5 100 0.011 N/A
non-hazardous ingredients Not Available 100 0.011 N/A
polyethylene glycol 25322-68-3 100 0.011 N/A
sodium bromide 7647-15-6 100 0.011 N/A
CC-7 Clay Stabilizer Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0908 N/A
water Not Available 100 0.0908 N/A
FR-22 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0506 N/A
non-hazardous ingredients Not Available 100 0.0506 N/A
S-17X Surfactant Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0431 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0431 N/A
methanol 67-56-1 100 0.0431 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0431 N/A
non-hazardous ingredients Not Available 100 0.0431 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-12-09 2019-12-12 Recycled Fracturing Water (treated at well site) 2372
2019-12-09 2019-12-12 Surface Water - Runoff 3830

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 527 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-13 Lost Circulation 160.00 210.00
2019-12-17 No Incident Encountered 0.00 0.00

For data sources see[9]

References