X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535223511000

Well Details

Well ID: 0535223511000
Loading map...
Location: 00/11-35-053-22W5/0
Location Alias: 00/11-35-53-22 W5M
Location Alias 2: 00/11-35-053-22 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 22
Section: 35
County/Municipality: Yellowhead County
Well Name: TOURMALINE SUNDANCE 11-35-53-22
Operator Name: Tourmaline Oil Corp.
License Number: 0411265
License Date: 2009-07-02
License Status: Issued
Spud Date: 2009-08-13
Final Drill Date: 2009-08-25
Well Total Depth: 3234.00 m
Surface Hole Latitude: 53.625004
Surface Hole Longitude: -117.128621

For data sources see[1][2]

Well History

Date Event
2009-07-02 Obtained License
2009-08-15 Surface Casing Operation Performed
2009-08-16 Direction Drilling Operation Performed - Deviate
2009-08-25 Finished Drilling
2009-08-25 Well Mode changed to Drilled and Cased
2009-08-26 Well Log Performed
2009-08-27 Well Log Performed
2009-08-28 Production Casing Operation Performed
2009-08-29 Rig Released
2009-09-11 Well Log Performed
2009-09-12 Perforation Treatment Performed - Fractured
2009-09-12 Perforation Treatment Performed - Jet Perforation
2009-09-12 Well Log Performed
2009-09-13 Perforation Treatment Performed - Fractured
2009-09-13 Perforation Treatment Performed - Jet Perforation
2009-09-13 Well Log Performed
2009-09-14 Perforation Treatment Performed - Fractured
2009-09-14 Perforation Treatment Performed - Jet Perforation
2009-11-13 Well Began Production
2009-11-13 Well Fluid changed to Gas
2009-11-13 Well Mode changed to Flowing
2012-09-20 Well Fluid changed to Gas
2012-09-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-08-16 650.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-12 Perforation 3204.00 3205.00 15
2009-09-13 Fracture 3100.50 3187.00 0
2009-09-13 Perforation 3033.00 3034.00 3
2009-09-13 Perforation 3026.00 3027.00 3
2009-09-13 Perforation 3012.00 3013.00 6
2009-09-13 Perforation 3006.00 3007.00 9
2009-09-13 Perforation 2983.00 2984.00 6
2009-09-13 Perforation 2978.50 2979.50 3
2009-09-13 Fracture 2978.50 3034.00 0
2009-09-13 Perforation 2899.00 2900.00 3
2009-09-13 Perforation 2892.00 2893.00 6
2009-09-12 Perforation 3197.50 3198.50 6
2009-09-14 Perforation 2866.00 2867.00 3
2009-09-14 Perforation 2849.50 2850.50 3
2009-09-14 Perforation 2844.50 2845.50 6
2009-09-14 Perforation 2838.00 2939.00 6
2009-09-14 Perforation 2823.00 2824.00 3
2009-09-14 Fracture 2823.00 2900.00 0
2009-09-12 Perforation 3194.00 3195.00 9
2009-09-12 Fracture 3194.00 3205.00 0
2009-09-12 Perforation 3186.00 3187.00 12
2009-09-12 Perforation 3171.50 3172.50 3
2009-09-12 Perforation 3136.50 3137.50 9
2009-09-12 Perforation 3128.00 3129.00 3
2009-09-12 Perforation 3100.50 3101.50 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1115 0.0 0.0 0.0
2010 8593 0.0 0.0 0.0
2011 8492 0.0 0.0 0.0
2012 8414 0.0 0.0 0.0
2013 7999 0.0 0.0 0.0
2014 8641 0.0 0.0 0.0
2015 8739 0.0 0.0 0.0
2016 8591 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References