If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0535213205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.615999,"lon":-117.060294,"icon":""}]} |
Location: 00/05-32-053-21W5/0 | |
Location Alias: 00/05-32-53-21 W5M | |
Location Alias 2: 00/05-32-053-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 5 | |
Range: 21 | |
Section: 32 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE SUNDANCE 5-32-53-21 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0433705 | |
License Date: 2011-05-24 | |
License Status: Issued | |
Spud Date: 2011-11-03 | |
Final Drill Date: 2011-12-10 | |
Well Total Depth: 3330.00 m | |
Surface Hole Latitude: 53.615999 | |
Surface Hole Longitude: -117.060294 |
Date | Event |
---|---|
2011-05-24 | Obtained License |
2011-11-04 | Direction Drilling Operation Performed - Deviate |
2011-11-07 | Surface Casing Operation Performed |
2011-11-26 | Well Log Performed |
2011-11-28 | Intermediate Casing Operation Performed |
2011-12-10 | Finished Drilling |
2011-12-10 | Well Log Performed |
2011-12-10 | Well Mode changed to Drilled and Cased |
2011-12-11 | Well Log Performed |
2011-12-13 | Production Casing Operation Performed |
2011-12-15 | Rig Released |
2012-02-25 | Well Log Performed |
2012-02-27 | Perforation Treatment Performed - Jet Perforation |
2012-02-28 | Perforation Treatment Performed - Jet Perforation |
2012-02-29 | Perforation Treatment Performed - Fractured |
2012-03-01 | Perforation Treatment Performed - Fractured |
2012-03-01 | Perforation Treatment Performed - Jet Perforation |
2012-03-02 | Perforation Treatment Performed - Fractured |
2012-03-02 | Perforation Treatment Performed - Jet Perforation |
2012-03-03 | Perforation Treatment Performed - Jet Perforation |
2012-03-04 | Perforation Treatment Performed - Fractured |
2012-03-05 | Perforation Treatment Performed - Jet Perforation |
2012-03-06 | Perforation Treatment Performed - Fractured |
2012-03-29 | Well Began Production |
2012-03-29 | Well Fluid changed to Gas |
2012-03-29 | Well Mode changed to Flowing |
2014-07-31 | Well Fluid changed to Gas |
2014-07-31 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-04 | 151.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-27 | Perforation | 3317.50 | 3317.90 | 10 |
2012-03-01 | Perforation | 3210.00 | 3210.50 | 10 |
2012-03-01 | Perforation | 3191.00 | 3191.90 | 10 |
2012-03-01 | Fracture | 3191.00 | 3244.50 | 0 |
2012-03-02 | Perforation | 3128.00 | 3128.30 | 10 |
2012-03-02 | Perforation | 3122.00 | 3122.40 | 10 |
2012-03-02 | Perforation | 3116.00 | 3116.60 | 10 |
2012-03-02 | Perforation | 3107.50 | 3108.10 | 10 |
2012-03-02 | Perforation | 3098.00 | 3098.40 | 10 |
2012-03-02 | Fracture | 3098.00 | 3128.30 | 0 |
2012-03-03 | Perforation | 3010.50 | 3011.50 | 10 |
2012-02-27 | Perforation | 3312.50 | 3313.30 | 10 |
2012-03-03 | Perforation | 3003.00 | 3003.40 | 10 |
2012-03-03 | Perforation | 2968.00 | 2968.70 | 10 |
2012-03-03 | Perforation | 2961.00 | 2961.40 | 10 |
2012-03-03 | Perforation | 2955.50 | 2956.00 | 10 |
2012-03-04 | Fracture | 2955.50 | 3011.50 | 0 |
2012-03-05 | Perforation | 2477.00 | 2477.90 | 10 |
2012-03-05 | Perforation | 2472.00 | 2472.90 | 10 |
2012-03-05 | Perforation | 2469.00 | 2469.90 | 10 |
2012-03-05 | Perforation | 2465.00 | 2465.90 | 10 |
2012-03-06 | Fracture | 2465.00 | 2477.90 | 0 |
2012-02-28 | Perforation | 3302.00 | 3302.50 | 10 |
2012-02-28 | Perforation | 3298.00 | 3298.30 | 10 |
2012-02-28 | Perforation | 3291.00 | 3291.40 | 10 |
2012-02-28 | Perforation | 3286.00 | 3286.30 | 10 |
2012-02-29 | Fracture | 3286.00 | 3317.90 | 0 |
2012-03-01 | Perforation | 3244.00 | 3244.50 | 10 |
2012-03-01 | Perforation | 3241.50 | 3242.30 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5838 | 0.0 | 0.0 | 0.0 |
2013 | 8376 | 0.0 | 0.0 | 0.0 |
2014 | 8572 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8486 | 0.0 | 0.0 | 0.0 |
2017 | 8639 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 1968 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]