X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535203016020

Well Details

Well ID: 0535203016020
Loading map...
Location: 02/16-30-053-20W5/0
Location Alias: 02/16-30-53-20 W5M
Location Alias 2: 02/16-30-053-20 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 20
Section: 30
County/Municipality: Yellowhead County
Well Name: TALISMAN 02 ANSELL 16-30-53-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0437403
License Date: 2011-10-04
License Status: Issued
Spud Date: 2011-10-25
Final Drill Date: 2011-11-07
Well Total Depth: 3052.00 m
Surface Hole Latitude: 53.613474
Surface Hole Longitude: -116.924302

For data sources see[1][2]

Well History

Date Event
2011-10-04 Obtained License
2011-10-27 Surface Casing Operation Performed
2011-10-30 Direction Drilling Operation Performed - Deviate
2011-11-01 Intermediate Casing Operation Performed
2011-11-07 Finished Drilling
2011-11-07 Well Log Performed
2011-11-07 Well Mode changed to Drilled and Cased
2011-11-08 Production Casing Operation Performed
2011-11-09 Rig Released
2011-11-09 Well Log Performed
2011-11-25 Perforation Treatment Performed - Fractured
2011-11-25 Perforation Treatment Performed - Jet Perforation
2011-11-30 Perforation Treatment Performed - Fractured
2011-11-30 Perforation Treatment Performed - Jet Perforation
2011-12-01 Perforation Treatment Performed - Fractured
2011-12-01 Perforation Treatment Performed - Jet Perforation
2012-01-05 Well Began Production
2012-01-05 Well Fluid changed to Gas
2012-01-05 Well Mode changed to Flowing
2017-07-01 Well Fluid changed to Gas
2017-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-30 1573.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-25 Perforation 3008.70 3009.30 13
2011-11-30 Perforation 2847.70 2848.30 13
2011-11-30 Perforation 2914.30 2914.60 13
2011-11-30 Perforation 2924.30 2924.60 13
2011-11-30 Perforation 2921.30 2921.60 13
2011-11-30 Fracture 3035.30 3042.80 0
2011-12-01 Perforation 2728.30 2728.60 13
2011-12-01 Perforation 2735.30 2735.60 13
2011-12-01 Perforation 2705.30 2705.60 13
2011-12-01 Fracture 2694.80 2814.60 0
2011-12-01 Perforation 2694.80 2695.10 13
2011-11-25 Perforation 3023.80 3024.10 13
2011-12-01 Fracture 2847.70 2853.60 0
2011-12-01 Fracture 2914.30 2924.60 0
2011-12-01 Perforation 2814.30 2814.60 13
2011-12-01 Perforation 2741.30 2741.60 13
2011-12-01 Perforation 2770.30 2770.60 13
2011-11-25 Fracture 2986.30 3027.60 0
2011-11-25 Perforation 2986.30 2986.60 13
2011-11-25 Perforation 3035.30 3035.60 13
2011-11-25 Perforation 3042.20 3042.80 13
2011-11-25 Perforation 3027.30 3027.60 13
2011-11-30 Perforation 2853.30 2853.60 13
2011-11-30 Perforation 2850.30 2850.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8423 0.0 0.0 0.0
2013 8543 0.0 0.0 0.0
2014 8663 0.0 0.0 0.0
2015 8412 0.0 0.0 0.0
2016 7679 0.0 0.0 0.0
2017 8475 0.0 0.0 0.0
2018 8351 0.0 0.0 0.0
2019 8012 0.0 0.0 0.0
2020 1991 0.0 0.0 0.0

For data sources see[6]

References