If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0535182905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.607409,"lon":-116.604447,"icon":""}]} |
Location: 00/05-29-053-18W5/0 | |
Location Alias: 00/05-29-53-18 W5M | |
Location Alias 2: 00/05-29-053-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 5 | |
Range: 18 | |
Section: 29 | |
County/Municipality: Yellowhead County | |
Well Name: LONG RUN HZ EDSON 5-29-53-18 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0440507 | |
License Date: 2011-12-06 | |
License Status: Amended | |
Spud Date: 2012-01-03 | |
Final Drill Date: 2012-01-28 | |
Well Total Depth: 4162.00 m | |
Surface Hole Latitude: 53.607409 | |
Surface Hole Longitude: -116.604447 |
Date | Event |
---|---|
2011-12-06 | Obtained License |
2012-01-06 | Surface Casing Operation Performed |
2012-01-11 | Direction Drilling Operation Performed - Deviate |
2012-01-13 | Direction Drilling Operation Performed - Horizontal |
2012-01-14 | Well Log Performed |
2012-01-16 | Intermediate Casing Operation Performed |
2012-01-28 | Finished Drilling |
2012-01-28 | Well Mode changed to Drilled and Cased |
2012-01-29 | Liner Casing Operation Performed |
2012-01-31 | Rig Released |
2012-02-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-28 | Well Began Production |
2012-02-28 | Well Fluid changed to Gas |
2012-02-28 | Well Mode changed to Flowing |
2016-05-01 | Well Fluid changed to Gas |
2016-05-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-03 | Horizon Drilling Inc. | 38 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-11 | 2298.50 | Deviate (5 - 79 degrees) |
2012-01-13 | 2793.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-05 | Multi-Stage Fracture | 4111.80 | 4147.50 | 0 |
2012-02-16 | Multi-Stage Fracture | 3439.60 | 3513.10 | 0 |
2012-02-16 | Multi-Stage Fracture | 3338.50 | 3439.60 | 0 |
2012-02-16 | Multi-Stage Fracture | 3296.00 | 3338.50 | 0 |
2012-02-16 | Multi-Stage Fracture | 3223.30 | 3296.00 | 0 |
2012-02-16 | Multi-Stage Fracture | 3163.40 | 3223.30 | 0 |
2012-02-16 | Multi-Stage Fracture | 3090.40 | 3163.40 | 0 |
2012-02-16 | Multi-Stage Fracture | 3017.00 | 3090.40 | 0 |
2012-02-17 | Multi-Stage Fracture | 2916.30 | 3017.00 | 0 |
2012-02-17 | Multi-Stage Fracture | 2883.90 | 2916.30 | 0 |
2012-02-14 | Multi-Stage Fracture | 4024.40 | 4111.80 | 0 |
2012-02-14 | Multi-Stage Fracture | 3951.80 | 4024.40 | 0 |
2012-02-14 | Multi-Stage Fracture | 3878.40 | 3951.70 | 0 |
2012-02-15 | Multi-Stage Fracture | 3805.60 | 3878.40 | 0 |
2012-02-15 | Multi-Stage Fracture | 3732.40 | 3805.60 | 0 |
2012-02-15 | Multi-Stage Fracture | 3732.40 | 3858.80 | 0 |
2012-02-15 | Multi-Stage Fracture | 3586.40 | 3858.80 | 0 |
2012-02-15 | Multi-Stage Fracture | 3513.10 | 3586.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6984 | 0.0 | 0.0 | 0.0 |
2013 | 8607 | 0.0 | 0.0 | 0.0 |
2014 | 7775 | 0.0 | 0.0 | 0.0 |
2015 | 8675 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8744 | 0.0 | 0.0 | 0.0 |
2018 | 8674 | 0.0 | 0.0 | 0.0 |
2019 | 8070 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[7]