X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535171910000

Well Details

Well ID: 0535171910000
Loading map...
Location: 00/10-19-053-17W5/0
Location Alias: 00/10-19-53-17 W5M
Location Alias 2: 00/10-19-053-17 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 17
Section: 19
County/Municipality: Yellowhead County
Well Name: TALISMAN EDSON 10-19-53-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0023700
License Date: 1963-01-24
License Status: Abandoned
Spud Date: 1963-01-28
Final Drill Date: 1963-02-24
Well Total Depth: 2685.00 m
Surface Hole Latitude: 53.593764
Surface Hole Longitude: -116.492086

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-24 Obtained License
1963-02-24 Finished Drilling
1963-02-27 Drill Stem Test Performed
1963-02-28 Drill Stem Test Performed
1963-03-01 Drill Stem Test Performed
1963-03-02 Production Casing Operation Performed
1963-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-14 Perforation Treatment Performed - Jet Perforation
1963-03-15 Perforation Treatment Performed - Jet Perforation
1963-04-30 Well Mode changed to Drilled and Cased
1965-11-20 Well Began Production
1965-11-20 Well Fluid changed to Gas
1965-11-20 Well Mode changed to Flowing
1989-08-23 Perforation Treatment Performed - Jet Perforation
2009-10-15 Perforation Treatment Performed - Cement Plug
2009-10-15 Plug Back Performed
2009-10-16 Perforation Treatment Performed - Cement Plug
2009-10-16 Perforation Treatment Performed - Cement Squeeze
2009-10-16 Plug Back Performed
2009-10-16 Well Fluid changed to Gas
2009-10-16 Well Mode changed to Abandoned Zone
2009-10-21 Well Abandoned
2009-10-21 Well Fluid changed to Gas
2009-10-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-03-14 Perforation 2572.50 2575.00 13
2009-10-16 Cement Plug 2539.00 2619.00 0
1963-03-14 Acid Treatment 2572.50 2575.00 0
1963-03-15 Perforation 2562.50 2571.60 12
1963-03-15 Perforation 2560.30 2561.50 12
1989-08-23 Perforation 2665.50 2668.50 13
2009-10-15 Cement Plug 2615.40 2661.20 0
2009-10-16 Cement Squeeze 2572.50 2575.90 0
2009-10-16 Cement Squeeze 2562.50 2571.60 0
2009-10-16 Cement Squeeze 2560.30 2561.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1245 0.0 0.0 0.0
1969 5062 0.0 0.0 0.0
1970 6608 0.0 0.0 0.0
1971 5144 0.0 0.0 0.0
1972 5687 0.0 0.0 0.0
1973 6375 0.0 0.0 0.0
1974 7573 0.0 0.0 0.0
1975 7501 0.0 0.0 0.0
1976 8040 0.0 0.0 0.0
1977 6639 0.0 0.0 0.0
1978 5520 0.0 0.0 0.0
1979 7075 0.0 0.0 0.0
1980 3790 0.0 0.0 0.0
1981 5631 0.0 0.0 0.0
1982 8511 0.0 0.0 0.0
1983 3074 0.0 0.0 0.0
1984 7011 0.0 0.0 0.0
1985 8452 0.0 0.0 0.0
1986 8474 0.0 0.0 0.0
1987 7713 0.0 0.0 0.0
1988 8401 0.0 0.0 0.0
1989 7864 0.0 0.0 0.0
1990 8620 0.0 0.0 0.0
1991 8445 0.0 0.0 0.0
1992 8398 0.0 0.0 0.0
1993 7680 0.0 0.0 0.0
1994 6802 0.0 0.0 0.0
1995 3965 0.0 0.0 0.0
1996 5137 0.0 0.0 0.0
1997 7629 0.0 0.0 0.0
1998 7852 0.0 0.0 0.0
1999 8317 0.0 0.0 0.0
2000 7651 0.0 0.0 0.0
2001 7637 0.0 0.0 0.0
2002 8500 0.0 0.0 0.0
2003 8362 0.0 0.0 0.0
2004 8772 0.0 0.0 0.0
2005 8178 0.0 0.0 0.0
2006 8281 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6119 0.0 0.0 0.0

For data sources see[5]

References