If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0535160812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.564798,"lon":-116.332118,"icon":""}]} |
| Location: 00/12-08-053-16W5/0 | |
| Location Alias: 00/12-08-53-16 W5M | |
| Location Alias 2: 00/12-08-053-16 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 053 | |
| Meridian: 5 | |
| Range: 16 | |
| Section: 08 | |
| County/Municipality: Yellowhead County | |
| Well Name: CHAMPLIN ET AL EDSON 12-8-53-16 | |
| Operator Name: Bridges Energy Inc. | |
| License Number: 0025438 | |
| License Date: 1964-01-06 | |
| License Status: RecCertified | |
| Spud Date: 1964-01-10 | |
| Final Drill Date: 1964-01-26 | |
| Well Total Depth: 1859.30 m | |
| Surface Hole Latitude: 53.564798 | |
| Surface Hole Longitude: -116.332118 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1964-01-06 | Obtained License |
| 1964-01-26 | Finished Drilling |
| 1964-01-26 | Well Mode changed to Drilled and Cased |
| 1964-01-28 | Production Casing Operation Performed |
| 1964-01-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1964-01-29 | Perforation Treatment Performed - Fractured |
| 1964-01-29 | Perforation Treatment Performed - Jet Perforation |
| 1964-02-03 | Well Began Production |
| 1964-02-03 | Well Fluid changed to Crude Oil |
| 1964-02-03 | Well Mode changed to Flowing |
| 1966-04-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1967-05-13 | Well Fluid changed to Crude Oil |
| 1967-05-13 | Well Mode changed to Pumping |
| 1983-06-01 | Well Fluid changed to Crude Oil |
| 1983-06-01 | Well Mode changed to Suspended |
| 1987-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1987-05-27 | Plug Back Performed |
| 1987-05-28 | Perforation Treatment Performed - Cement Squeeze |
| 1987-05-28 | Perforation Treatment Performed - Jet Perforation |
| 1987-06-03 | Perforation Treatment Performed - Jet Perforation |
| 1992-02-27 | Well Fluid changed to Crude Oil |
| 1992-02-27 | Well Mode changed to Closed |
| 1994-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-08-12 | Perforation Treatment Performed - Jet Perforation |
| 1994-08-12 | Perforation Treatment Performed - Remedial Casing |
| 1994-08-12 | Plug Back Performed |
| 1994-08-12 | Well Fluid changed to Crude Oil |
| 1994-08-12 | Well Mode changed to Abandoned |
| 1994-08-14 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1964-01-29 | Perforation | 1837.30 | 1838.60 | 7 |
| 1994-08-12 | Perforation | 484.00 | 484.30 | 13 |
| 1994-08-12 | Remedial Casing Cementing | 484.00 | 484.30 | 0 |
| 1964-01-29 | Acid Treatment | 1837.30 | 1838.60 | 0 |
| 1964-01-29 | Fracture | 1837.30 | 1838.60 | 0 |
| 1966-04-14 | Acid Treatment | 1837.30 | 1838.60 | 0 |
| 1987-05-27 | Packing Device Capped w/Cement | 1811.00 | 1829.00 | 0 |
| 1987-05-28 | Perforation | 1305.00 | 1306.50 | 13 |
| 1987-05-28 | Cement Squeeze | 1305.00 | 1306.50 | 0 |
| 1987-06-03 | Perforation | 1225.00 | 1229.00 | 13 |
| 1994-08-12 | Packing Device Capped w/Cement | 1207.00 | 1215.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 5927 | 0.0 | 0.0 | 0.0 |
| 1968 | 456 | 0.0 | 0.0 | 0.0 |
| 1970 | 72 | 0.0 | 0.0 | 0.0 |
| 1971 | 16 | 0.0 | 0.0 | 0.0 |
| 1972 | 1968 | 0.0 | 0.0 | 0.0 |
| 1973 | 93 | 0.0 | 0.0 | 0.0 |
| 1976 | 2424 | 0.0 | 0.0 | 0.0 |
| 1977 | 2832 | 0.0 | 0.0 | 0.0 |
| 1978 | 1853 | 0.0 | 0.0 | 0.0 |
For data sources see[5]