X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535153613000

Well Details

Well ID: 0535153613000
Loading map...
Location: 00/13-36-053-15W5/0
Location Alias: 00/13-36-53-15 W5M
Location Alias 2: 00/13-36-053-15 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 15
Section: 36
County/Municipality: Yellowhead County
Well Name: BEC HZ CARROT 13-36-53-15
Operator Name: Bonavista Energy Corporation
License Number: 0433011
License Date: 2011-04-14
License Status: Issued
Spud Date: 2011-05-18
Final Drill Date: 2011-06-01
Well Total Depth: 3665.00 m
Surface Hole Latitude: 53.613010
Surface Hole Longitude: -116.086639

For data sources see[1][2]

Well History

Date Event
2011-04-14 Obtained License
2011-05-19 Surface Casing Operation Performed
2011-05-21 Direction Drilling Operation Performed - Horizontal
2011-05-26 Well Log Performed
2011-05-27 Intermediate Casing Operation Performed
2011-06-01 Finished Drilling
2011-06-01 Well Log Performed
2011-06-01 Well Mode changed to Drilled and Cased
2011-06-03 Liner Casing Operation Performed
2011-06-03 Perforation Treatment Performed - Open-Hole Completion
2011-06-03 Perforation Treatment Performed - Slotted Liner or Casing
2011-06-04 Rig Released
2011-06-23 Well Log Performed
2011-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-10 Well Began Production
2011-07-10 Well Fluid changed to Gas
2011-07-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-05-21 1955.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-06-03 Open Hole/Barefoot Completion 2463.00 3665.00 0
2011-06-28 Multi-Stage Fracture 3313.60 3425.40 0
2011-06-28 Multi-Stage Fracture 3425.40 3549.80 0
2011-06-28 Multi-Stage Fracture 3549.80 3665.00 0
2011-06-03 Slotted Liner 2463.00 3660.00 0
2011-06-28 Multi-Stage Fracture 2490.70 2602.50 0
2011-06-28 Multi-Stage Fracture 2602.50 2714.40 0
2011-06-28 Multi-Stage Fracture 2714.20 2840.20 0
2011-06-28 Multi-Stage Fracture 2840.20 2951.20 0
2011-06-28 Multi-Stage Fracture 2951.20 3077.00 0
2011-06-28 Multi-Stage Fracture 3077.00 3188.20 0
2011-06-28 Multi-Stage Fracture 3188.20 3313.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4158 0.0 0.0 0.0
2012 8771 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8725 0.0 0.0 0.0
2016 8632 0.0 0.0 0.0
2017 8027 0.0 0.0 0.0
2018 8694 0.0 0.0 0.0
2019 8368 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[6]

References