If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0535152504002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.61283,"lon":-116.086639,"icon":""}]} |
| Location: 00/04-25-053-15W5/2 | |
| Location Alias: 00/04-25-53-15 W5M | |
| Location Alias 2: 00/04-25-053-15 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 053 | |
| Meridian: 5 | |
| Range: 15 | |
| Section: 25 | |
| County/Municipality: Yellowhead County | |
| Well Name: BEC HZ CARROT 4-25-53-15 | |
| Operator Name: Bonavista Energy Corporation | |
| License Number: 0433010 | |
| License Date: 2011-04-14 | |
| License Status: Amended | |
| Spud Date: 2011-04-27 | |
| Final Drill Date: 2011-05-14 | |
| Well Total Depth: 3477.00 m | |
| Surface Hole Latitude: 53.612830 | |
| Surface Hole Longitude: -116.086639 |
| Date | Event |
|---|---|
| 2011-04-14 | Obtained License |
| 2011-04-27 | Surface Casing Operation Performed |
| 2011-05-05 | Direction Drilling Operation Performed - Horizontal |
| 2011-05-07 | Well Log Performed |
| 2011-05-08 | Intermediate Casing Operation Performed |
| 2011-05-14 | Finished Drilling |
| 2011-05-14 | Well Mode changed to Drilled and Cased |
| 2011-05-17 | Liner Casing Operation Performed |
| 2011-05-17 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-05-17 | Rig Released |
| 2011-05-17 | Well Log Performed |
| 2011-06-23 | Well Log Performed |
| 2011-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-07-11 | Well Began Production |
| 2011-07-11 | Well Fluid changed to Gas |
| 2011-07-11 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-05-05 | 2120.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-05-17 | Open Hole/Barefoot Completion | 2385.00 | 3477.00 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 2515.30 | 2614.10 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 2402.90 | 2515.30 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 3367.90 | 3476.00 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 3256.50 | 3367.90 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 3157.70 | 3256.50 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 3049.00 | 3157.70 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 2937.20 | 3049.00 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 2838.50 | 2937.20 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 2726.50 | 2838.50 | 0 |
| 2011-06-24 | Multi-Stage Fracture | 2614.10 | 2726.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 4084 | 0.0 | 0.0 | 0.0 |
| 2012 | 8772 | 0.0 | 0.0 | 0.0 |
| 2013 | 8305 | 0.0 | 0.0 | 0.0 |
| 2014 | 8759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8727 | 0.0 | 0.0 | 0.0 |
| 2016 | 8582 | 0.0 | 0.0 | 0.0 |
| 2017 | 8359 | 0.0 | 0.0 | 0.0 |
| 2018 | 8669 | 0.0 | 0.0 | 0.0 |
| 2019 | 8490 | 0.0 | 0.0 | 0.0 |
| 2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[6]