X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535091506002

Well Details

Well ID: 0535091506002
Loading map...
Location: 00/06-15-053-09W5/2
Location Alias: 00/06-15-53-09 W5M
Location Alias 2: 00/06-15-053-09 W5/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 09
Section: 15
County/Municipality: Yellowhead County
Well Name: BEI WILDWD 6-15-53-9
Operator Name: Tangle Creek Energy Ltd.
License Number: 0165247
License Date: 1994-02-18
License Status: Abandoned
Spud Date: 1994-03-11
Final Drill Date: 1994-03-23
Well Total Depth: 1891.00 m
Surface Hole Latitude: 53.575624
Surface Hole Longitude: -115.247486

For data sources see[1][2]

Well History

Date Event
1994-02-18 Obtained License
1994-03-13 Surface Casing Operation Performed
1994-03-20 Well Log Performed
1994-03-21 Drill Stem Test Performed
1994-03-22 Drill Stem Test Performed
1994-03-23 Finished Drilling
1994-03-23 Well Mode changed to Drilled and Cased
1994-03-24 Well Log Performed
1994-03-25 Production Casing Operation Performed
1994-03-25 Rig Released
1994-04-14 Perforation Treatment Performed - Jet Perforation
1994-04-14 Well Log Performed
1994-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-10 Perforation Treatment Performed - Jet Perforation
1994-07-10 Well Log Performed
1994-07-19 Perforation Treatment Performed - Fractured
1994-07-19 Well Log Performed
1994-07-28 Perforation Treatment Performed - Fractured
2001-06-01 Well Began Production
2001-06-01 Well Fluid changed to Gas
2001-06-01 Well Mode changed to Flowing
2002-11-21 Well Log Performed
2002-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-22 Plug Back Performed
2002-11-22 Well Log Performed
2002-11-24 Perforation Treatment Performed - Jet Perforation
2002-11-24 Well Log Performed
2002-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-25 Plug Back Performed
2002-11-25 Well Fluid changed to Gas
2002-11-25 Well Mode changed to Abandoned Zone
2002-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-26 Plug Back Performed
2002-11-27 Perforation Treatment Performed - Jet Perforation
2002-11-27 Well Log Performed
2002-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-29 Plug Back Performed
2002-11-29 Well Log Performed
2011-09-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-14 Perforation 1849.00 1854.00 18
2002-11-25 Packing Device Capped w/Cement 1822.00 1830.00 0
2002-11-26 Packing Device Capped w/Cement 1780.00 1788.00 0
2002-11-27 Perforation 1597.00 1600.00 13
2002-11-29 Packing Device Capped w/Cement 1585.50 1593.50 0
1994-04-15 Acid Treatment 1849.00 1854.00 0
1994-04-17 Acid Treatment 1849.00 1854.00 0
1994-07-10 Perforation 1794.50 1796.50 18
1994-07-10 Perforation 1797.00 1798.00 13
1994-07-19 Fracture 1794.50 1798.00 0
1994-07-28 Fracture 1794.50 1798.00 0
2002-11-22 Packing Device Capped w/Cement 1843.00 1846.00 0
2002-11-24 Perforation 1833.00 1836.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 268 0.0 0.0 0.0
2001 1494 0.0 0.0 0.0
2002 90 0.0 0.0 0.0

For data sources see[5]

References