If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0534171605004 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/05-16-053-17W4/4 | |
| Location Alias: 00/05-16-53-17 W4M | |
| Location Alias 2: 00/05-16-053-17 W4/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 053 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 16 | |
| County/Municipality: Lamont County | |
| Well Name: PINE CLIFF NORRIS 5-16-53-17 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0143923 | |
| License Date: 1990-04-10 | |
| License Status: Abandoned | |
| Spud Date: 1990-05-23 | |
| Final Drill Date: 1990-05-26 | |
| Well Total Depth: 936.00 m | |
| Surface Hole Latitude: 53.576977 | |
| Surface Hole Longitude: -112.453971 |
| Date | Event |
|---|---|
| 1990-04-10 | Obtained License |
| 1990-05-24 | Surface Casing Operation Performed |
| 1990-05-26 | Finished Drilling |
| 1990-05-26 | Well Log Performed |
| 1990-05-26 | Well Mode changed to Drilled and Cased |
| 1990-05-28 | Production Casing Operation Performed |
| 1990-05-28 | Rig Released |
| 1990-06-01 | Perforation Treatment Performed - Jet Perforation |
| 1990-06-01 | Well Log Performed |
| 1994-07-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-07-10 | Plug Back Performed |
| 1994-07-12 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-14 | Perforation Treatment Performed - Jet Perforation |
| 2004-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-02-08 | Perforation Treatment Performed - Jet Perforation |
| 2004-02-08 | Plug Back Performed |
| 2004-02-09 | Well Began Production |
| 2004-02-09 | Well Fluid changed to Gas |
| 2004-02-09 | Well Mode changed to Flowing |
| 2005-04-01 | Well Fluid changed to Gas |
| 2005-04-01 | Well Mode changed to Suspended |
| 2005-08-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-08-15 | Plug Back Performed |
| 2005-08-15 | Well Fluid changed to Gas |
| 2005-08-15 | Well Mode changed to Abandoned Zone |
| 2005-08-16 | Perforation Treatment Performed - Jet Perforation |
| 2005-08-16 | Well Log Performed |
| 2005-08-18 | Perforation Treatment Performed - Jet Perforation |
| 2005-08-18 | Well Log Performed |
| 2007-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-09-22 | Plug Back Performed |
| 2007-09-22 | Well Log Performed |
| 2007-09-23 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-06-01 | Perforation | 853.50 | 854.50 | 14 |
| 2005-08-16 | Perforation | 681.00 | 685.00 | 17 |
| 2005-08-18 | Perforation | 698.00 | 699.00 | 17 |
| 2007-09-22 | Packing Device Capped w/Cement | 667.00 | 675.00 | 0 |
| 1990-06-01 | Perforation | 834.00 | 837.00 | 14 |
| 1994-07-10 | Packing Device Capped w/Cement | 848.00 | 851.00 | 0 |
| 1994-07-12 | Perforation | 796.00 | 798.00 | 13 |
| 1994-07-14 | Perforation | 834.00 | 837.00 | 13 |
| 2004-02-08 | Packing Device Capped w/Cement | 828.00 | 831.00 | 0 |
| 2004-02-08 | Perforation | 817.00 | 820.00 | 20 |
| 2005-08-15 | Packing Device Capped w/Cement | 785.00 | 793.00 | 0 |
| 2005-08-15 | Packing Device Capped w/Cement | 806.00 | 814.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]