If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534120505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.544636,"lon":-111.740457,"icon":""}]} |
Location: 00/05-05-053-12W4/0 | |
Location Alias: 00/05-05-53-12 W4M | |
Location Alias 2: 00/05-05-053-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 12 | |
Section: 05 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF PLAIN 5-5-53-12 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0055690 | |
License Date: 1975-11-04 | |
License Status: Abandoned | |
Spud Date: 1975-11-09 | |
Final Drill Date: 1975-11-14 | |
Well Total Depth: 768.10 m | |
Surface Hole Latitude: 53.544636 | |
Surface Hole Longitude: -111.740457 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-11-04 | Obtained License |
1975-11-14 | Finished Drilling |
1975-11-14 | Well Mode changed to Drilled and Cased |
1975-11-15 | Production Casing Operation Performed |
1975-11-19 | Perforation Treatment Performed - Jet Perforation |
1975-12-05 | Perforation Treatment Performed - Jet Perforation |
1976-01-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-02-12 | Perforation Treatment Performed - Jet Perforation |
1976-02-17 | Perforation Treatment Performed - Jet Perforation |
1976-02-28 | Well Began Production |
1976-02-28 | Well Fluid changed to Gas |
1976-02-28 | Well Mode changed to Flowing |
1976-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-03-16 | Perforation Treatment Performed - Jet Perforation |
1982-06-01 | Well Fluid changed to Gas |
1982-06-01 | Well Mode changed to Suspended |
1982-11-01 | Well Fluid changed to Gas |
1982-11-01 | Well Mode changed to Flowing |
2001-10-01 | Well Fluid changed to Gas |
2001-10-01 | Well Mode changed to Suspended |
2003-12-09 | Well Fluid changed to Gas |
2003-12-09 | Well Mode changed to Flowing |
2004-03-01 | Well Fluid changed to Gas |
2004-03-01 | Well Mode changed to Pumping |
2006-06-01 | Well Fluid changed to Gas |
2006-06-01 | Well Mode changed to Suspended |
2008-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-20 | Plug Back Performed |
2008-02-20 | Well Fluid changed to Gas |
2008-02-20 | Well Mode changed to Abandoned Zone |
2008-02-21 | Well Log Performed |
2008-02-22 | Perforation Treatment Performed - Jet Perforation |
2008-03-26 | Perforation Treatment Performed - Remedial Casing |
2008-03-27 | Perforation Treatment Performed - Jet Perforation |
2008-03-27 | Well Log Performed |
2008-03-28 | Perforation Treatment Performed - Remedial Casing |
2008-05-14 | Well Abandoned |
2008-05-14 | Well Fluid changed to Gas |
2008-05-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-11-19 | Perforation | 725.40 | 726.60 | 13 |
2008-02-20 | Packing Device Capped w/Cement | 607.00 | 615.00 | 0 |
2008-02-22 | Perforation | 416.00 | 417.00 | 17 |
2008-03-26 | Remedial Casing Cementing | 416.00 | 417.00 | 0 |
2008-03-27 | Perforation | 241.00 | 242.00 | 17 |
2008-03-28 | Remedial Casing Cementing | 241.00 | 242.00 | 0 |
1975-12-05 | Perforation | 672.10 | 673.30 | 13 |
1976-01-14 | Packing Device Capped w/Cement | 716.30 | 716.30 | 0 |
1976-02-12 | Perforation | 672.10 | 673.30 | 13 |
1976-02-17 | Perforation | 725.40 | 726.60 | 13 |
1976-02-17 | Perforation | 720.50 | 722.10 | 13 |
1976-03-15 | Packing Device Capped w/Cement | 713.20 | 719.30 | 0 |
1976-03-15 | Packing Device Capped w/Cement | 658.40 | 664.50 | 0 |
1976-03-16 | Perforation | 619.00 | 620.60 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 7184 | 0.0 | 0.0 | 0.0 |
1977 | 8232 | 0.0 | 0.0 | 0.0 |
1978 | 7034 | 0.0 | 0.0 | 0.0 |
1979 | 8151 | 0.0 | 0.0 | 0.0 |
1980 | 4575 | 0.0 | 0.0 | 0.0 |
1981 | 5949 | 0.0 | 0.0 | 0.0 |
1982 | 3628 | 0.0 | 0.0 | 0.0 |
1983 | 5724 | 0.0 | 0.0 | 0.0 |
1984 | 6353 | 0.0 | 0.0 | 0.0 |
1985 | 5593 | 0.0 | 0.0 | 0.0 |
1986 | 2942 | 0.0 | 0.0 | 0.0 |
1987 | 909 | 0.0 | 0.0 | 0.0 |
1988 | 6328 | 0.0 | 0.0 | 0.0 |
1989 | 7216 | 0.0 | 0.0 | 0.0 |
1990 | 6800 | 0.0 | 0.0 | 0.0 |
1991 | 6827 | 0.0 | 0.0 | 0.0 |
1992 | 7791 | 0.0 | 0.0 | 0.0 |
1993 | 8712 | 0.0 | 0.0 | 0.0 |
1994 | 8731 | 0.0 | 0.0 | 0.0 |
1995 | 8700 | 0.0 | 0.0 | 0.0 |
1996 | 8759 | 0.0 | 0.0 | 0.0 |
1997 | 8748 | 0.0 | 0.0 | 0.0 |
1998 | 8669 | 0.0 | 0.0 | 0.0 |
1999 | 8604 | 0.0 | 0.0 | 0.0 |
2000 | 7796 | 0.0 | 0.0 | 0.0 |
2003 | 744 | 0.0 | 0.0 | 0.0 |
2004 | 7857 | 0.0 | 0.0 | 0.0 |
2005 | 8641 | 0.0 | 0.0 | 0.0 |
2006 | 3623 | 0.0 | 0.0 | 0.0 |
For data sources see[5]