If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534120503003 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/03-05-053-12W4/3 | |
Location Alias: 00/03-05-53-12 W4M | |
Location Alias 2: 00/03-05-053-12 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 12 | |
Section: 05 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF PLAIN 3-5-53-12 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0058020 | |
License Date: 1976-04-30 | |
License Status: Abandoned | |
Spud Date: 1976-01-20 | |
Final Drill Date: 1976-01-25 | |
Well Total Depth: 771.10 m | |
Surface Hole Latitude: 53.544443 | |
Surface Hole Longitude: -111.740134 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-01-25 | Finished Drilling |
1976-01-25 | Well Mode changed to Drilled and Cased |
1976-01-27 | Production Casing Operation Performed |
1976-02-19 | Perforation Treatment Performed - Jet Perforation |
1976-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-04-30 | Obtained License |
1976-05-27 | Perforation Treatment Performed - Cement Squeeze |
1976-05-27 | Perforation Treatment Performed - Jet Perforation |
1976-06-04 | Perforation Treatment Performed - Jet Perforation |
1976-06-29 | Perforation Treatment Performed - Jet Perforation |
1977-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-01-20 | Perforation Treatment Performed - Jet Perforation |
1977-01-21 | Well Began Production |
1977-01-21 | Well Fluid changed to Gas |
1977-01-21 | Well Mode changed to Flowing |
1988-09-04 | Well Fluid changed to Gas |
1988-09-04 | Well Mode changed to Suspended |
2000-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-13 | Plug Back Performed |
2000-09-13 | Well Fluid changed to Gas |
2000-09-13 | Well Log Performed |
2000-09-13 | Well Mode changed to Abandoned Zone |
2000-09-14 | Perforation Treatment Performed - Jet Perforation |
2000-09-14 | Perforation Treatment Performed - Remedial Casing |
2000-09-16 | Well Abandoned |
2000-09-16 | Well Fluid changed to Gas |
2000-09-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-02-19 | Perforation | 677.90 | 679.70 | 7 |
2000-09-13 | Packing Device Capped w/Cement | 695.00 | 703.00 | 0 |
2000-09-14 | Perforation | 204.00 | 204.30 | 96 |
2000-09-14 | Remedial Casing Cementing | 204.00 | 204.30 | 0 |
1976-02-21 | Acid Treatment | 677.90 | 679.70 | 0 |
1976-05-27 | Cement Squeeze | 677.90 | 679.70 | 0 |
1976-05-27 | Perforation | 728.50 | 729.40 | 7 |
1976-06-04 | Perforation | 730.60 | 732.70 | 7 |
1976-06-29 | Perforation | 735.80 | 737.60 | 7 |
1977-01-20 | Packing Device Capped w/Cement | 723.90 | 723.90 | 0 |
1977-01-20 | Perforation | 706.80 | 708.70 | 10 |
1977-01-20 | Perforation | 715.10 | 716.60 | 10 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 2036 | 0.0 | 0.0 | 0.0 |
1978 | 7314 | 0.0 | 0.0 | 0.0 |
1979 | 5050 | 0.0 | 0.0 | 0.0 |
1980 | 5803 | 0.0 | 0.0 | 0.0 |
1981 | 4671 | 0.0 | 0.0 | 0.0 |
1982 | 7936 | 0.0 | 0.0 | 0.0 |
1983 | 8634 | 0.0 | 0.0 | 0.0 |
1984 | 8749 | 0.0 | 0.0 | 0.0 |
1985 | 4970 | 0.0 | 0.0 | 0.0 |
1986 | 3389 | 0.0 | 0.0 | 0.0 |
1987 | 743 | 0.0 | 0.0 | 0.0 |
1988 | 1639 | 0.0 | 0.0 | 0.0 |
For data sources see[5]