If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534102909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.610285,"lon":-111.432197,"icon":""}]} |
Location: 00/09-29-053-10W4/0 | |
Location Alias: 00/09-29-53-10 W4M | |
Location Alias 2: 00/09-29-053-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 10 | |
Section: 29 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: DOME ET AL DUVERNAY 9-29-53-10 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0085211 | |
License Date: 1980-08-26 | |
License Status: RecCertified | |
Spud Date: 1980-09-01 | |
Final Drill Date: 1980-09-06 | |
Well Total Depth: 709.00 m | |
Surface Hole Latitude: 53.610285 | |
Surface Hole Longitude: -111.432197 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-26 | Obtained License |
1980-09-04 | Drill Stem Test Performed |
1980-09-06 | Finished Drilling |
1980-09-07 | Drill Stem Test Performed |
1980-09-08 | Drill Stem Test Performed |
1980-09-09 | Production Casing Operation Performed |
1980-10-24 | Perforation Treatment Performed - Jet Perforation |
1980-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-30 | Well Mode changed to Drilled and Cased |
1984-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-03-18 | Plug Back Performed |
1984-03-18 | Well Mode changed to Abandoned |
1984-03-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-10-24 | Perforation | 545.80 | 548.00 | 13 |
1980-10-24 | Perforation | 469.00 | 472.50 | 13 |
1980-10-25 | Acid Treatment | 469.00 | 472.50 | 0 |
1980-10-30 | Acid Treatment | 545.80 | 548.00 | 0 |
1984-03-18 | Packing Device Capped w/Cement | 534.00 | 542.00 | 0 |
1984-03-18 | Packing Device Capped w/Cement | 452.00 | 460.00 | 0 |
For data sources see[4]