X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534102909000

Well Details

Well ID: 0534102909000
Loading map...
Location: 00/09-29-053-10W4/0
Location Alias: 00/09-29-53-10 W4M
Location Alias 2: 00/09-29-053-10 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 10
Section: 29
County/Municipality: County of Two Hills No. 21
Well Name: DOME ET AL DUVERNAY 9-29-53-10
Operator Name: BP Canada Energy Group ULC
License Number: 0085211
License Date: 1980-08-26
License Status: RecCertified
Spud Date: 1980-09-01
Final Drill Date: 1980-09-06
Well Total Depth: 709.00 m
Surface Hole Latitude: 53.610285
Surface Hole Longitude: -111.432197

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-26 Obtained License
1980-09-04 Drill Stem Test Performed
1980-09-06 Finished Drilling
1980-09-07 Drill Stem Test Performed
1980-09-08 Drill Stem Test Performed
1980-09-09 Production Casing Operation Performed
1980-10-24 Perforation Treatment Performed - Jet Perforation
1980-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-30 Well Mode changed to Drilled and Cased
1984-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-18 Plug Back Performed
1984-03-18 Well Mode changed to Abandoned
1984-03-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-24 Perforation 545.80 548.00 13
1980-10-24 Perforation 469.00 472.50 13
1980-10-25 Acid Treatment 469.00 472.50 0
1980-10-30 Acid Treatment 545.80 548.00 0
1984-03-18 Packing Device Capped w/Cement 534.00 542.00 0
1984-03-18 Packing Device Capped w/Cement 452.00 460.00 0

For data sources see[4]



References