X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534063605000

Well Details

Well ID: 0534063605000
Loading map...
Location: 00/05-36-053-06W4/0
Location Alias: 00/05-36-53-06 W4M
Location Alias 2: 00/05-36-053-06 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 06
Section: 36
County/Municipality: County of Vermilion River
Well Name: KRANG LIND 5-36-53-6
Operator Name: Harvest Operations Corp.
License Number: 0195686
License Date: 1996-12-19
License Status: Suspension
Spud Date: 1997-01-03
Final Drill Date: 1997-01-06
Well Total Depth: 644.50 m
Surface Hole Latitude: 53.619588
Surface Hole Longitude: -110.762462

For data sources see[1][2]

Well History

Date Event
1996-12-19 Obtained License
1997-01-04 Surface Casing Operation Performed
1997-01-06 Finished Drilling
1997-01-06 Well Log Performed
1997-01-06 Well Mode changed to Drilled and Cased
1997-01-07 Production Casing Operation Performed
1997-01-08 Rig Released
1997-01-25 Well Log Performed
1997-01-27 Perforation Treatment Performed - Jet Perforation
1997-01-27 Well Log Performed
1997-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-03 Plug Back Performed
1997-03-04 Perforation Treatment Performed - Jet Perforation
1997-03-04 Well Log Performed
1997-03-09 Well Began Production
1997-03-09 Well Fluid changed to Crude Bitumen
1997-03-09 Well Mode changed to Pumping
1999-02-01 Well Fluid changed to Crude Bitumen
1999-02-01 Well Mode changed to Suspended
1999-06-08 Well Fluid changed to Crude Bitumen
1999-06-08 Well Mode changed to Pumping
2002-08-19 Perforation Treatment Performed - Jet Perforation
2004-10-01 Perforation Treatment Performed - Jet Perforation
2004-10-01 Well Log Performed
2007-11-01 Well Fluid changed to Crude Bitumen
2007-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-27 Perforation 621.00 624.00 13
1997-03-03 Packing Device Capped w/Cement 608.00 616.00 0
1997-03-04 Perforation 539.00 542.00 13
2002-08-19 Perforation 539.50 543.50 26
2004-10-01 Perforation 529.00 531.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6338 0.0 0.0 0.0
1998 1392 0.0 0.0 0.0
1999 4440 0.0 0.0 0.0
2000 8270 0.0 0.0 0.0
2001 8696 0.0 0.0 0.0
2002 7698 0.0 0.0 0.0
2003 8399 0.0 0.0 0.0
2004 5773 0.0 0.0 0.0
2005 768 0.0 0.0 0.0
2006 1344 0.0 0.0 0.0

For data sources see[5]

References