X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534021811D02

Well Details

Well ID: 0534021811D02
Loading map...
Location: D0/11-18-053-02W4/2
Location Alias: D0/11-18-53-02 W4M
Location Alias 2: D0/11-18-053-02 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 02
Section: 18
County/Municipality: County of Vermilion River
Well Name: CNRL MARWAYNE 11-18-53-2
Operator Name: Canadian Natural Resources Limited
License Number: 0070581
License Date: 1978-07-07
License Status: Suspension
Spud Date: 1978-10-02
Final Drill Date: 1978-10-06
Well Total Depth: 650.00 m
Surface Hole Latitude: 53.579775
Surface Hole Longitude: -110.290151

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-07 Obtained License
1978-10-06 Finished Drilling
1978-10-06 Well Mode changed to Drilled and Cased
1978-10-07 Production Casing Operation Performed
1978-12-04 Perforation Treatment Performed - Jet Perforation
1996-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-23 Perforation Treatment Performed - Jet Perforation
1996-03-23 Plug Back Performed
1996-03-23 Well Log Performed
1996-04-01 Well Began Production
1996-04-01 Well Fluid changed to Crude Bitumen
1996-04-01 Well Mode changed to Pumping
2001-08-31 Well Fluid changed to Crude Bitumen
2001-08-31 Well Mode changed to Suspended
2001-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-15 Perforation Treatment Performed - Cement Plug
2001-10-15 Plug Back Performed
2001-10-15 Well Fluid changed to Crude Bitumen
2001-10-15 Well Mode changed to Abandoned Zone
2001-10-17 Perforation Treatment Performed - Jet Perforation
2001-10-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-04 Perforation 603.00 605.50 7
1996-03-23 Packing Device Capped w/Cement 592.00 600.00 0
1996-03-23 Perforation 519.50 521.00 26
1996-03-23 Perforation 523.50 525.00 26
2001-10-15 Cement Plug 530.00 590.00 0
2001-10-15 Packing Device Capped w/Cement 490.00 515.00 0
2001-10-17 Perforation 475.80 476.30 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 4577 0.0 0.0 0.0
1997 1546 0.0 0.0 0.0
1999 1529 0.0 0.0 0.0
2000 1631 0.0 0.0 0.0
2001 719 0.0 0.0 0.0

For data sources see[5]

References