X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525252207000

Well Details

Well ID: 0525252207000
Loading map...
Location: 00/07-22-052-25W5/0
Location Alias: 00/07-22-52-25 W5M
Location Alias 2: 00/07-22-052-25 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 25
Section: 22
County/Municipality: Yellowhead County
Well Name: TOURMALINE HINTON 7-22-52-25
Operator Name: Tourmaline Oil Corp.
License Number: 0419022
License Date: 2010-03-03
License Status: Issued
Spud Date: 2010-07-11
Final Drill Date: 2010-08-14
Well Total Depth: 4215.00 m
Surface Hole Latitude: 53.503103
Surface Hole Longitude: -117.594659

For data sources see[1][2]

Well History

Date Event
2010-03-03 Obtained License
2010-07-13 Surface Casing Operation Performed
2010-07-16 Lost Circulation Occurred
2010-07-26 Kick Occurred
2010-07-28 Intermediate Casing Operation Performed
2010-07-29 Lost Circulation Occurred
2010-08-14 Finished Drilling
2010-08-14 Well Mode changed to Drilled and Cased
2010-08-16 Well Log Performed
2010-08-18 Production Casing Operation Performed
2010-08-18 Rig Released
2010-08-23 Well Log Performed
2010-08-24 Perforation Treatment Performed - Jet Perforation
2010-08-24 Well Log Performed
2010-08-25 Perforation Treatment Performed - Fractured
2010-08-25 Perforation Treatment Performed - Jet Perforation
2010-08-25 Well Log Performed
2010-08-26 Perforation Treatment Performed - Fractured
2010-08-26 Perforation Treatment Performed - Jet Perforation
2010-08-26 Well Log Performed
2010-08-27 Perforation Treatment Performed - Fractured
2010-11-09 Well Began Production
2010-11-09 Well Fluid changed to Gas
2010-11-09 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-24 Perforation 4178.00 4179.00 9
2010-08-26 Perforation 3870.00 3871.00 6
2010-08-26 Fracture 3870.00 4095.00 0
2010-08-26 Perforation 3783.00 3784.00 9
2010-08-26 Perforation 3772.00 3773.00 6
2010-08-26 Perforation 3764.00 3765.00 9
2010-08-26 Perforation 3772.00 3773.00 6
2010-08-26 Perforation 3764.00 3765.00 9
2010-08-26 Perforation 3716.00 3717.00 6
2010-08-26 Perforation 3707.00 3708.00 6
2010-08-26 Fracture 3707.00 3784.00 0
2010-08-24 Perforation 4163.00 4164.00 12
2010-08-26 Perforation 3125.00 3126.00 15
2010-08-26 Perforation 3121.00 3122.00 12
2010-08-26 Perforation 3070.50 3071.50 12
2010-08-27 Fracture 3070.50 3126.00 0
2010-08-24 Perforation 4156.00 4157.00 12
2010-08-24 Perforation 4141.00 4142.00 15
2010-08-25 Fracture 4141.00 4179.00 0
2010-08-25 Perforation 4094.00 4095.00 9
2010-08-26 Perforation 3930.50 3931.50 9
2010-08-26 Perforation 3916.50 3917.50 6
2010-08-26 Perforation 3883.00 3884.00 9

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1216 0.0 0.0 0.0
2011 8696 0.0 0.0 0.0
2012 8512 0.0 0.0 0.0
2013 8670 0.0 0.0 0.0
2014 8733 0.0 0.0 0.0
2015 8616 0.0 0.0 0.0
2016 8666 0.0 0.0 0.0
2017 8663 0.0 0.0 0.0
2018 8606 0.0 0.0 0.0
2019 8579 0.0 0.0 0.0
2020 1896 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-16 Lost Circulation 1415.00 1559.00
2010-07-26 Kick 2803.00 2803.00
2010-07-29 Lost Circulation 2785.00 2785.00

For data sources see[6]

References