If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525230913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.469679,"lon":-117.337121,"icon":""}]} |
Location: 00/13-09-052-23W5/0 | |
Location Alias: 00/13-09-52-23 W5M | |
Location Alias 2: 00/13-09-052-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 23 | |
Section: 09 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE HZ PEPPERS 13-9-52-23 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0476524 | |
License Date: 2015-08-11 | |
License Status: Issued | |
Spud Date: 2015-09-12 | |
Final Drill Date: 2015-10-04 | |
Well Total Depth: 4518.00 m | |
Surface Hole Latitude: 53.469679 | |
Surface Hole Longitude: -117.337121 |
Date | Event |
---|---|
2015-08-11 | Obtained License |
2015-09-14 | Surface Casing Operation Performed |
2015-09-23 | Intermediate Casing Operation Performed |
2015-09-25 | Direction Drilling Operation Performed - Deviate |
2015-09-30 | Direction Drilling Operation Performed - Horizontal |
2015-10-01 | Well Log Performed |
2015-10-04 | Finished Drilling |
2015-10-04 | Well Log Performed |
2015-10-04 | Well Mode changed to Drilled and Cased |
2015-10-05 | Well Log Performed |
2015-10-08 | Production Casing Operation Performed |
2015-10-09 | Rig Released |
2015-10-17 | Well Log Performed |
2015-10-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-27 | Well Fluid changed to Gas |
2015-10-27 | Well Mode changed to Testing |
2015-11-01 | Well Began Production |
2015-11-01 | Well Fluid changed to Gas |
2015-11-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-09-12 | Dc Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-09-25 | 3028.60 | Deviate (5 - 79 degrees) |
2015-09-30 | 3385.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-10-18 | Multi-Stage Fracture | 4473.30 | 4473.40 | 0 |
2015-10-20 | Multi-Stage Fracture | 4007.70 | 4007.80 | 0 |
2015-10-20 | Multi-Stage Fracture | 3955.00 | 3955.10 | 0 |
2015-10-20 | Multi-Stage Fracture | 3902.50 | 3902.60 | 0 |
2015-10-20 | Multi-Stage Fracture | 3849.70 | 3849.80 | 0 |
2015-10-20 | Multi-Stage Fracture | 3797.20 | 3797.30 | 0 |
2015-10-20 | Multi-Stage Fracture | 3744.40 | 3744.50 | 0 |
2015-10-20 | Multi-Stage Fracture | 3691.70 | 3691.80 | 0 |
2015-10-20 | Multi-Stage Fracture | 3639.20 | 3639.30 | 0 |
2015-10-20 | Multi-Stage Fracture | 3586.50 | 3586.60 | 0 |
2015-10-20 | Multi-Stage Fracture | 3534.00 | 3534.10 | 0 |
2015-10-19 | Multi-Stage Fracture | 4428.80 | 4428.90 | 0 |
2015-10-20 | Multi-Stage Fracture | 3493.90 | 3494.00 | 0 |
2015-10-20 | Multi-Stage Fracture | 3453.80 | 3453.90 | 0 |
2015-10-19 | Multi-Stage Fracture | 4376.10 | 4376.20 | 0 |
2015-10-19 | Multi-Stage Fracture | 4323.40 | 4323.50 | 0 |
2015-10-19 | Multi-Stage Fracture | 4270.60 | 4270.70 | 0 |
2015-10-19 | Multi-Stage Fracture | 4217.90 | 4218.00 | 0 |
2015-10-20 | Multi-Stage Fracture | 4165.20 | 4165.30 | 0 |
2015-10-20 | Multi-Stage Fracture | 4112.40 | 4112.50 | 0 |
2015-10-20 | Multi-Stage Fracture | 4060.10 | 4060.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-10-18 | 2015-10-20 | 3,309 | 5,231 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 84.9296 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 5.6206 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 5.6206 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 7.3247 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.7598 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.013 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.013 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.013 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.013 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.013 | N/A | ||||
CC-77 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.1895 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1895 | N/A | ||||
FR-9 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0908 | N/A | |
alcohols. C12-14. ethoxylated | 68439-50-9 | 100 | 0.0908 | N/A | ||||
alcohols. C12-16. ethoxylated | 68551-12-2 | 100 | 0.0908 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0908 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0908 | N/A | ||||
S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0715 | N/A | |
isopropanol | 67-63-0 | 100 | 0.0715 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0715 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0715 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0715 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-10-17 | 2015-10-20 | Recycled Fracturing Water (treated at well site) | 2971 |
2015-10-16 | 2015-10-20 | Oilfield Produced Water | 2197 |
2015-09-17 | 2015-09-17 | Surface Water - Lake | 63 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 1549 | 0.0 | 0.0 | 0.0 |
2016 | 8778 | 0.0 | 0.0 | 0.0 |
2017 | 8259 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8712 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-04 | No Incident Encountered | 0.00 | 0.00 |
2015-11-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]