If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525221901020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.511841,"lon":-117.225719,"icon":""}]} |
Location: 02/01-19-052-22W5/0 | |
Location Alias: 02/01-19-52-22 W5M | |
Location Alias 2: 02/01-19-052-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 22 | |
Section: 19 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE HZ 102 LAMBERT 1-19-52-22 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0490986 | |
License Date: 2018-09-17 | |
License Status: Issued | |
Spud Date: 2018-10-08 | |
Final Drill Date: 2018-10-28 | |
Well Total Depth: 4416.00 m | |
Surface Hole Latitude: 53.511841 | |
Surface Hole Longitude: -117.225719 |
Date | Event |
---|---|
2018-09-17 | Obtained License |
2018-10-08 | Direction Drilling Operation Performed - Deviate |
2018-10-09 | Surface Casing Operation Performed |
2018-10-12 | Kick Occurred |
2018-10-21 | Intermediate Casing Operation Performed |
2018-10-25 | Direction Drilling Operation Performed - Horizontal |
2018-10-25 | Well Log Performed |
2018-10-28 | Finished Drilling |
2018-10-28 | Well Log Performed |
2018-10-28 | Well Mode changed to Drilled and Cased |
2018-10-31 | Production Casing Operation Performed |
2018-10-31 | Rig Released |
2018-11-18 | Well Log Performed |
2018-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-11-24 | Well Began Production |
2018-11-24 | Well Fluid changed to Gas |
2018-11-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-10-08 | Nabors Drilling Canada Limited | 16 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-10-08 | 164.70 | Deviate (5 - 79 degrees) |
2018-10-25 | 3318.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-11-21 | Multi-Stage Fracture | 4229.60 | 4229.70 | 0 |
2018-11-22 | Multi-Stage Fracture | 3687.90 | 3688.00 | 0 |
2018-11-22 | Multi-Stage Fracture | 3647.60 | 3647.70 | 0 |
2018-11-22 | Multi-Stage Fracture | 3530.40 | 3530.50 | 0 |
2018-11-22 | Multi-Stage Fracture | 3477.40 | 3477.50 | 0 |
2018-11-22 | Multi-Stage Fracture | 3424.50 | 3424.60 | 0 |
2018-11-22 | Multi-Stage Fracture | 3358.90 | 3359.00 | 0 |
2018-11-21 | Multi-Stage Fracture | 4187.80 | 4187.90 | 0 |
2018-11-21 | Multi-Stage Fracture | 4134.90 | 4135.00 | 0 |
2018-11-21 | Multi-Stage Fracture | 4082.00 | 4082.10 | 0 |
2018-11-21 | Multi-Stage Fracture | 4029.00 | 4029.10 | 0 |
2018-11-21 | Multi-Stage Fracture | 3976.60 | 3976.70 | 0 |
2018-11-22 | Multi-Stage Fracture | 3923.60 | 3923.70 | 0 |
2018-11-22 | Multi-Stage Fracture | 3871.10 | 3871.20 | 0 |
2018-11-22 | Multi-Stage Fracture | 3818.10 | 3818.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-11-21 | 2018-11-22 | 3,211 | 3,685 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 84.5567 | N/A | |||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 10.4237 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.8097 | N/A | ||
WayProp (40/70) | Trican | phenolic resin | 9003-35-4 | 100 | 3.0213 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 3.0213 | N/A | ||||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0098 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0098 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0098 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0098 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0098 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0918 | N/A | |
water | Not Available | 100 | 0.0918 | N/A | ||||
FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0458 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0458 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0407 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0407 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0407 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0407 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0407 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-11-19 | 2018-11-19 | Municipal Water | 30 |
2018-11-21 | 2018-11-21 | Recycled Fracturing Water (treated at well site) | 663 |
2018-11-19 | 2018-11-23 | Surface Water - Runoff | 2992 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 804 | 0.0 | 0.0 | 0.0 |
2019 | 8650 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-10-12 | Kick | 2302.00 | 2315.00 |
2018-12-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]