If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525213310000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.535196,"lon":-117.033806,"icon":""}]} |
Location: 00/10-33-052-21W5/0 | |
Location Alias: 00/10-33-52-21 W5M | |
Location Alias 2: 00/10-33-052-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 21 | |
Section: 33 | |
County/Municipality: Yellowhead County | |
Well Name: BP HB ET AL OBED 10-33-52-21 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0054724 | |
License Date: 1975-08-28 | |
License Status: Suspension | |
Spud Date: 1975-09-06 | |
Final Drill Date: 1975-12-27 | |
Well Total Depth: 3430.80 m | |
Surface Hole Latitude: 53.535196 | |
Surface Hole Longitude: -117.033806 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-08-28 | Obtained License |
1975-11-06 | Drill Stem Test Performed |
1975-11-07 | Drill Stem Test Performed |
1975-11-08 | Drill Stem Test Performed |
1975-11-29 | Drill Stem Test Performed |
1975-12-27 | Finished Drilling |
1975-12-27 | Well Log Performed |
1975-12-31 | Liner Casing Operation Performed |
1976-01-25 | Perforation Treatment Performed - Jet Perforation |
1976-01-26 | Perforation Treatment Performed - Cement Squeeze |
1976-01-26 | Perforation Treatment Performed - Jet Perforation |
1976-01-27 | Perforation Treatment Performed - Jet Perforation |
1976-01-28 | Perforation Treatment Performed - Cement Squeeze |
1976-01-30 | Drill Stem Test Performed |
1976-01-30 | Perforation Treatment Performed - Jet Perforation |
1976-02-03 | Perforation Treatment Performed - Cement Squeeze |
1976-02-04 | Perforation Treatment Performed - Cement Squeeze |
1976-02-05 | Perforation Treatment Performed - Jet Perforation |
1976-02-06 | Drill Stem Test Performed |
1976-02-10 | Perforation Treatment Performed - Cement Squeeze |
1976-02-11 | Perforation Treatment Performed - Cement Squeeze |
1976-02-12 | Perforation Treatment Performed - Cement Squeeze |
1976-02-14 | Drill Stem Test Performed |
1976-02-15 | Perforation Treatment Performed - Cement Plug |
1976-02-16 | Perforation Treatment Performed - Cement Squeeze |
1976-03-13 | Perforation Treatment Performed - Jet Perforation |
1976-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-03-21 | Well Mode changed to Drilled and Cased |
1989-02-21 | Perforation Treatment Performed - Jet Perforation |
1990-01-01 | Well Began Production |
1990-01-01 | Well Fluid changed to Gas |
1990-01-01 | Well Mode changed to Flowing |
2011-11-22 | Well Fluid changed to Gas |
2011-11-22 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-01-25 | Perforation | 3396.10 | 3396.70 | 13 |
1976-02-04 | Cement Squeeze | 2895.60 | 2896.20 | 0 |
1976-02-05 | Perforation | 3386.00 | 3387.20 | 3 |
1976-02-05 | Perforation | 3389.40 | 3390.60 | 3 |
1976-02-10 | Cement Squeeze | 3319.30 | 3319.90 | 0 |
1976-02-11 | Cement Squeeze | 3255.30 | 3255.90 | 0 |
1976-02-12 | Cement Squeeze | 2895.60 | 2896.20 | 0 |
1976-02-15 | Cement Plug | 3240.00 | 3390.60 | 0 |
1976-02-16 | Cement Squeeze | 2895.60 | 2896.20 | 0 |
1976-03-13 | Perforation | 2856.60 | 2859.60 | 7 |
1976-03-14 | Acid Treatment | 2856.60 | 2859.60 | 0 |
1976-01-26 | Perforation | 3319.30 | 3319.90 | 13 |
1989-02-21 | Perforation | 2856.10 | 2861.00 | 20 |
1976-01-26 | Cement Squeeze | 3319.30 | 3319.90 | 0 |
1976-01-26 | Perforation | 3255.30 | 3255.90 | 13 |
1976-01-27 | Perforation | 2895.60 | 2896.20 | 13 |
1976-01-28 | Cement Squeeze | 2895.60 | 2896.20 | 0 |
1976-01-30 | Perforation | 3393.60 | 3395.50 | 7 |
1976-01-30 | Perforation | 3386.00 | 3390.00 | 7 |
1976-02-03 | Cement Squeeze | 3386.00 | 3390.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 128 | 0.0 | 0.0 | 0.0 |
1990 | 4368 | 0.0 | 0.0 | 0.0 |
1991 | 5726 | 0.0 | 0.0 | 0.0 |
1992 | 8404 | 0.0 | 0.0 | 0.0 |
1993 | 8727 | 0.0 | 0.0 | 0.0 |
1994 | 8550 | 0.0 | 0.0 | 0.0 |
1995 | 8686 | 0.0 | 0.0 | 0.0 |
1996 | 8688 | 0.0 | 0.0 | 0.0 |
1997 | 8657 | 0.0 | 0.0 | 0.0 |
1998 | 8671 | 0.0 | 0.0 | 0.0 |
1999 | 8505 | 0.0 | 0.0 | 0.0 |
2000 | 8705 | 0.0 | 0.0 | 0.0 |
2001 | 8638 | 0.0 | 0.0 | 0.0 |
2002 | 8626 | 0.0 | 0.0 | 0.0 |
2003 | 8645 | 0.0 | 0.0 | 0.0 |
2004 | 8561 | 0.0 | 0.0 | 0.0 |
2005 | 8606 | 0.0 | 0.0 | 0.0 |
2006 | 8643 | 0.0 | 0.0 | 0.0 |
2007 | 4094 | 0.0 | 0.0 | 0.0 |
2008 | 1008 | 0.0 | 0.0 | 0.0 |
2009 | 995 | 0.0 | 0.0 | 0.0 |
2010 | 3 | 0.0 | 0.0 | 0.0 |
For data sources see[5]