X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525212608002

Well Details

Well ID: 0525212608002
Loading map...
Location: 00/08-26-052-21W5/2
Location Alias: 00/08-26-52-21 W5M
Location Alias 2: 00/08-26-052-21 W5/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 21
Section: 26
County/Municipality: Yellowhead County
Well Name: TALISMAN DD MEDLODGE 8-26-52-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0265590
License Date: 2002-01-04
License Status: Abandoned
Spud Date: 2002-02-28
Final Drill Date: 2002-03-29
Well Total Depth: 2402.00 m
Surface Hole Latitude: 53.517173
Surface Hole Longitude: -116.979503

For data sources see[1][2]

Well History

Date Event
2002-01-04 Obtained License
2002-03-09 Surface Casing Operation Performed
2002-03-23 Direction Drilling Operation Performed - Deviate
2002-03-29 Finished Drilling
2002-03-29 Well Log Performed
2002-03-29 Well Mode changed to Drilled and Cased
2002-03-31 Production Casing Operation Performed
2002-03-31 Rig Released
2002-04-18 Perforation Treatment Performed - Jet Perforation
2002-04-18 Well Log Performed
2002-04-19 Perforation Treatment Performed - Fractured
2002-04-21 Perforation Treatment Performed - Jet Perforation
2002-04-21 Well Log Performed
2002-04-23 Perforation Treatment Performed - Fractured
2005-02-15 Well Structure changed to Commingled
2017-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-15 Perforation Treatment Performed - Jet Perforation
2017-02-15 Plug Back Performed
2017-02-15 Well Log Performed
2017-02-15 Well Mode changed to Abandoned Zone
2017-02-15 Well Structure changed to Commingled
2017-02-16 Perforation Treatment Performed - Cement Plug
2017-02-16 Perforation Treatment Performed - Remedial Casing
2017-02-16 Plug Back Performed
2017-07-23 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-03-23 1784.40 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-04-18 Perforation 2366.00 2369.00 20
2002-04-19 Fracture 2366.00 2369.00 0
2002-04-21 Perforation 2330.00 2333.00 20
2002-04-23 Fracture 2330.00 2333.00 0
2017-02-15 Packing Device Capped w/Cement 2316.80 2324.80 0
2017-02-15 Perforation 583.00 584.00 17
2017-02-16 Remedial Casing Cementing 583.00 584.00 0
2017-02-16 Cement Plug 498.60 604.40 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References