X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525200603003

Well Details

Well ID: 0525200603003
Loading map...
Location: 00/03-06-052-20W5/3
Location Alias: 00/03-06-52-20 W5M
Location Alias 2: 00/03-06-052-20 W5/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 20
Section: 06
County/Municipality: Yellowhead County
Well Name: BVE SFER ANSELL 3-6-52-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0171620
License Date: 1994-10-19
License Status: Amended
Spud Date: 1994-11-14
Final Drill Date: 1994-12-16
Well Total Depth: 3370.00 m
Surface Hole Latitude: 53.457359
Surface Hole Longitude: -116.941522

For data sources see[1][2]

Well History

Date Event
1994-10-19 Obtained License
1994-11-17 Surface Casing Operation Performed
1994-11-26 Well Log Performed
1994-12-16 Finished Drilling
1994-12-16 Well Log Performed
1994-12-22 Kick Occurred
1994-12-23 Production Casing Operation Performed
1994-12-23 Rig Released
1995-02-10 Well Log Performed
1995-02-11 Perforation Treatment Performed - Jet Perforation
1995-02-13 Perforation Treatment Performed - Acid Wash - No Pressure
1995-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-02 Well Log Performed
1995-03-05 Perforation Treatment Performed - Jet Perforation
1995-03-05 Well Log Performed
1995-03-09 Perforation Treatment Performed - Fractured
1995-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-24 Plug Back Performed
1995-10-26 Perforation Treatment Performed - Jet Perforation
1995-10-26 Well Log Performed
1995-11-09 Well Mode changed to Drilled and Cased
2003-07-14 Perforation Treatment Performed - Cement Squeeze
2006-07-02 Perforation Treatment Performed - Jet Perforation
2006-07-05 Perforation Treatment Performed - Cement Squeeze
2006-07-05 Plug Back Performed
2006-07-10 Well Log Performed
2006-07-11 Perforation Treatment Performed - Jet Perforation
2006-07-14 Perforation Treatment Performed - Fractured
2006-07-25 Perforation Treatment Performed - Jet Perforation
2006-07-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-11 Perforation 3326.50 3333.00 17
2006-07-02 Perforation 2876.50 2885.00 18
2006-07-05 Cement Squeeze 2876.50 2885.00 0
2006-07-11 Perforation 3233.00 3237.00 20
2006-07-14 Fracture 3233.00 3237.00 0
2006-07-25 Perforation 3147.00 3150.00 20
2006-07-29 Fracture 3147.00 3150.00 0
1995-02-11 Perforation 3338.00 3341.50 17
1995-02-13 Acid Wash 3326.50 3341.50 0
1995-03-02 Packing Device Capped w/Cement 3285.00 3293.00 0
1995-03-05 Perforation 2876.50 2885.00 18
1995-03-09 Fracture 2876.50 2885.00 0
1995-10-24 Packing Device Capped w/Cement 2837.00 2845.00 0
1995-10-26 Perforation 2395.50 2412.00 18
2003-07-14 Cement Squeeze 2395.00 2412.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-12-22 Kick 3370.00 3370.00

For data sources see[5]

References