X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525193205000

Well Details

Well ID: 0525193205000
Loading map...
Location: 00/05-32-052-19W5/0
Location Alias: 00/05-32-52-19 W5M
Location Alias 2: 00/05-32-052-19 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 19
Section: 32
County/Municipality: Yellowhead County
Well Name: TALISMAN EDSON 5-32-52-19
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0174135
License Date: 1994-12-14
License Status: Issued
Spud Date: 1995-01-01
Final Drill Date: 1995-01-24
Well Total Depth: 3055.00 m
Surface Hole Latitude: 53.530615
Surface Hole Longitude: -116.772484

For data sources see[1][2]

Well History

Date Event
1994-12-14 Obtained License
1995-01-05 Surface Casing Operation Performed
1995-01-12 Direction Drilling Operation Performed - Deviate
1995-01-24 Finished Drilling
1995-01-24 Well Log Performed
1995-01-25 Drill Stem Test Performed
1995-01-27 Drill Stem Test Performed
1995-01-29 Production Casing Operation Performed
1995-01-30 Rig Released
1995-03-15 Well Log Performed
1995-03-16 Perforation Treatment Performed - Jet Perforation
1995-03-16 Well Log Performed
1995-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-17 Plug Back Performed
1995-03-18 Perforation Treatment Performed - Jet Perforation
1995-03-18 Well Log Performed
1995-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-20 Well Mode changed to Drilled and Cased
1999-04-15 Well Began Production
1999-04-15 Well Fluid changed to Gas
1999-04-15 Well Mode changed to Flowing
2014-01-13 Well Fluid changed to Gas
2014-01-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-01-12 2136.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-16 Perforation 3031.00 3032.00 20
1995-03-17 Packing Device Capped w/Cement 3019.00 3027.00 0
1995-03-18 Perforation 3012.50 3015.50 17
1995-03-20 Acid Treatment 3012.50 3015.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6201 0.0 0.0 0.0
2000 7649 0.0 0.0 0.0
2001 8645 0.0 0.0 0.0
2002 8626 0.0 0.0 0.0
2003 8758 0.0 0.0 0.0
2004 8719 0.0 0.0 0.0
2005 8145 0.0 0.0 0.0
2006 8056 0.0 0.0 0.0
2007 8424 0.0 0.0 0.0
2008 8673 0.0 0.0 0.0
2009 8033 0.0 0.0 0.0
2010 8340 0.0 0.0 0.0
2011 8640 0.0 0.0 0.0
2012 8183 0.0 0.0 0.0
2013 8495 0.0 0.0 0.0
2014 7511 0.0 0.0 0.0
2015 7847 0.0 0.0 0.0
2016 6983 0.0 0.0 0.0
2017 6551 0.0 0.0 0.0
2018 7944 0.0 0.0 0.0
2019 7806 0.0 0.0 0.0
2020 1681 0.0 0.0 0.0

For data sources see[6]

References