X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525152016002

Well Details

Well ID: 0525152016002
Loading map...
Location: 00/16-20-052-15W5/2
Location Alias: 00/16-20-52-15 W5M
Location Alias 2: 00/16-20-052-15 W5/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 15
Section: 20
County/Municipality: Yellowhead County
Well Name: POC EDSON 16-20-52-15
Operator Name: Perpetual Operating Corp.
License Number: 0330307
License Date: 2005-05-03
License Status: Abandoned
Spud Date: 2005-09-26
Final Drill Date: 2005-10-12
Well Total Depth: 2535.00 m
Surface Hole Latitude: 53.508566
Surface Hole Longitude: -116.168034

For data sources see[1][2]

Well History

Date Event
2005-05-03 Obtained License
2005-09-27 Lost Circulation Occurred
2005-09-30 Surface Casing Operation Performed
2005-10-06 Direction Drilling Operation Performed - Deviate
2005-10-12 Finished Drilling
2005-10-12 Well Mode changed to Drilled and Cased
2005-10-13 Well Log Performed
2005-10-14 Production Casing Operation Performed
2005-10-15 Rig Released
2005-11-21 Well Log Performed
2005-11-22 Perforation Treatment Performed - Jet Perforation
2005-11-22 Well Log Performed
2005-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-27 Plug Back Performed
2005-11-27 Well Log Performed
2005-12-04 Perforation Treatment Performed - Jet Perforation
2005-12-04 Well Log Performed
2005-12-05 Perforation Treatment Performed - Fractured
2006-01-12 Perforation Treatment Performed - Fractured
2006-02-23 Well Log Performed
2006-02-24 Perforation Treatment Performed - Jet Perforation
2006-02-26 Perforation Treatment Performed - Fractured
2006-03-29 Perforation Treatment Performed - Jet Perforation
2006-06-22 Perforation Treatment Performed - Fractured
2006-10-12 Well Log Performed
2017-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-12-09 Plug Back Performed
2017-12-09 Well Log Performed
2017-12-09 Well Mode changed to Abandoned Zone
2017-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-12-10 Plug Back Performed
2017-12-10 Well Log Performed
2017-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-12-11 Plug Back Performed
2017-12-11 Well Log Performed
2018-01-23 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-10-06 2246.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-22 Perforation 2509.50 2511.50 17
2006-02-26 Fracture 2350.00 2352.50 0
2006-03-29 Perforation 2140.50 2141.50 17
2006-03-29 Perforation 2145.00 2150.00 17
2006-06-22 Fracture 2140.50 2150.00 0
2017-12-09 Packing Device Capped w/Cement 2403.70 2411.30 0
2017-12-10 Packing Device Capped w/Cement 2334.70 2342.70 0
2017-12-11 Packing Device Capped w/Cement 2121.70 2129.70 0
2005-11-24 Acid Treatment 2509.50 2511.50 0
2005-11-27 Packing Device Capped w/Cement 2494.00 2502.00 0
2005-12-04 Perforation 2428.50 2429.50 17
2005-12-04 Perforation 2431.00 2434.00 17
2005-12-04 Perforation 2423.00 2425.00 17
2005-12-05 Fracture 2423.00 2434.00 0
2006-01-12 Fracture 2423.00 2434.00 0
2006-02-24 Perforation 2350.00 2352.50 17

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-09-27 Lost Circulation 205.00 208.00
2017-12-07 No Incident Encountered 0.00 0.00
2017-12-09 No Incident Encountered 0.00 0.00
2017-12-10 No Incident Encountered 0.00 0.00
2017-12-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References