X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525150401020

Well Details

Well ID: 0525150401020
Loading map...
Location: 02/01-04-052-15W5/0
Location Alias: 02/01-04-52-15 W5M
Location Alias 2: 02/01-04-052-15 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 15
Section: 04
County/Municipality: Yellowhead County
Well Name: POC 02 EDSON 1-4-52-15
Operator Name: Perpetual Operating Corp.
License Number: 0423796
License Date: 2010-09-24
License Status: Issued
Spud Date: 2010-10-21
Final Drill Date: 2010-11-09
Well Total Depth: 4012.00 m
Surface Hole Latitude: 53.467772
Surface Hole Longitude: -116.159760

For data sources see[1][2]

Well History

Date Event
2010-09-24 Obtained License
2010-10-23 Surface Casing Operation Performed
2010-10-28 Direction Drilling Operation Performed - Deviate
2010-10-31 Direction Drilling Operation Performed - Horizontal
2010-10-31 Well Log Performed
2010-11-01 Intermediate Casing Operation Performed
2010-11-02 Well Log Performed
2010-11-09 Finished Drilling
2010-11-09 Well Log Performed
2010-11-09 Well Mode changed to Drilled and Cased
2010-11-10 Well Log Performed
2010-11-11 Liner Casing Operation Performed
2010-11-13 Rig Released
2010-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-31 Well Began Production
2010-12-31 Well Fluid changed to Gas
2010-12-31 Well Mode changed to Flowing
2011-01-21 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-28 2111.81 Deviate (5 - 79 degrees)
2010-10-31 2459.23 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-17 Multi-Stage Fracture 2634.40 2635.20 0
2010-12-18 Multi-Stage Fracture 3129.80 3130.60 0
2010-12-18 Multi-Stage Fracture 2960.00 2960.80 0
2010-12-18 Multi-Stage Fracture 2796.60 2797.40 0
2010-12-18 Multi-Stage Fracture 2634.40 2635.20 0
2011-01-21 Open Hole/Barefoot Completion 3969.00 4012.00 0
2010-12-17 Multi-Stage Fracture 2796.60 2797.40 0
2010-12-17 Multi-Stage Fracture 2960.00 2960.80 0
2010-12-17 Multi-Stage Fracture 3129.80 3130.60 0
2010-12-17 Multi-Stage Fracture 3285.80 3286.60 0
2010-12-17 Multi-Stage Fracture 3435.90 3436.70 0
2010-12-17 Multi-Stage Fracture 3598.60 3599.40 0
2010-12-17 Multi-Stage Fracture 3766.40 3767.20 0
2010-12-17 Multi-Stage Fracture 3930.70 3932.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 48 0.0 0.0 0.0
2011 8375 0.0 0.0 0.0
2012 8616 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 7944 0.0 0.0 0.0
2015 3864 0.0 0.0 0.0
2016 8664 0.0 0.0 0.0
2017 6311 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[6]

References