X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525133213002

Well Details

Well ID: 0525133213002
Loading map...
Location: 00/13-32-052-13W5/2
Location Alias: 00/13-32-52-13 W5M
Location Alias 2: 00/13-32-052-13 W5/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 13
Section: 32
County/Municipality: Yellowhead County
Well Name: PINE CLIFF CARROT 13-32-52-13
Operator Name: Pine Cliff Energy Ltd.
License Number: 0251531
License Date: 2001-02-20
License Status: Issued
Spud Date: 2001-05-22
Final Drill Date: 2001-06-08
Well Total Depth: 2321.00 m
Surface Hole Latitude: 53.539919
Surface Hole Longitude: -115.887887

For data sources see[1][2]

Well History

Date Event
2001-02-20 Obtained License
2001-05-25 Surface Casing Operation Performed
2001-05-28 Direction Drilling Operation Performed - Deviate
2001-06-08 Finished Drilling
2001-06-08 Well Mode changed to Drilled and Cased
2001-06-09 Well Log Performed
2001-06-10 Production Casing Operation Performed
2001-06-10 Rig Released
2001-06-17 Perforation Treatment Performed - Jet Perforation
2001-06-17 Well Log Performed
2001-06-19 Perforation Treatment Performed - Fractured
2001-07-04 Well Log Performed
2001-07-05 Well Log Performed
2001-07-06 Perforation Treatment Performed - Jet Perforation
2001-07-07 Perforation Treatment Performed - Fractured
2001-08-03 Well Began Production
2001-08-03 Well Fluid changed to Gas
2001-08-03 Well Mode changed to Flowing
2001-09-01 Well Fluid changed to Gas
2001-09-01 Well Mode changed to Suspended
2002-04-01 Well Structure changed to Commingled
2003-03-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-05-28 1385.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-06-17 Perforation 2270.50 2275.00 17
2001-06-19 Fracture 2270.60 2275.00 0
2001-07-06 Perforation 2232.00 2236.00 17
2001-07-07 Fracture 2232.00 2236.00 0
2003-03-24 Perforation 2196.50 2198.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 6 0.0 0.0 0.0

For data sources see[6]

References