If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0525133213002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.539919,"lon":-115.887887,"icon":""}]} |
| Location: 00/13-32-052-13W5/2 | |
| Location Alias: 00/13-32-52-13 W5M | |
| Location Alias 2: 00/13-32-052-13 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 052 | |
| Meridian: 5 | |
| Range: 13 | |
| Section: 32 | |
| County/Municipality: Yellowhead County | |
| Well Name: PINE CLIFF CARROT 13-32-52-13 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0251531 | |
| License Date: 2001-02-20 | |
| License Status: Issued | |
| Spud Date: 2001-05-22 | |
| Final Drill Date: 2001-06-08 | |
| Well Total Depth: 2321.00 m | |
| Surface Hole Latitude: 53.539919 | |
| Surface Hole Longitude: -115.887887 |
| Date | Event |
|---|---|
| 2001-02-20 | Obtained License |
| 2001-05-25 | Surface Casing Operation Performed |
| 2001-05-28 | Direction Drilling Operation Performed - Deviate |
| 2001-06-08 | Finished Drilling |
| 2001-06-08 | Well Mode changed to Drilled and Cased |
| 2001-06-09 | Well Log Performed |
| 2001-06-10 | Production Casing Operation Performed |
| 2001-06-10 | Rig Released |
| 2001-06-17 | Perforation Treatment Performed - Jet Perforation |
| 2001-06-17 | Well Log Performed |
| 2001-06-19 | Perforation Treatment Performed - Fractured |
| 2001-07-04 | Well Log Performed |
| 2001-07-05 | Well Log Performed |
| 2001-07-06 | Perforation Treatment Performed - Jet Perforation |
| 2001-07-07 | Perforation Treatment Performed - Fractured |
| 2001-08-03 | Well Began Production |
| 2001-08-03 | Well Fluid changed to Gas |
| 2001-08-03 | Well Mode changed to Flowing |
| 2001-09-01 | Well Fluid changed to Gas |
| 2001-09-01 | Well Mode changed to Suspended |
| 2002-04-01 | Well Structure changed to Commingled |
| 2003-03-24 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2001-05-28 | 1385.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2001-06-17 | Perforation | 2270.50 | 2275.00 | 17 |
| 2001-06-19 | Fracture | 2270.60 | 2275.00 | 0 |
| 2001-07-06 | Perforation | 2232.00 | 2236.00 | 17 |
| 2001-07-07 | Fracture | 2232.00 | 2236.00 | 0 |
| 2003-03-24 | Perforation | 2196.50 | 2198.00 | 20 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 6 | 0.0 | 0.0 | 0.0 |
For data sources see[6]