X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525122308003

Well Details

Well ID: 0525122308003
Loading map...
Location: 00/08-23-052-12W5/3
Location Alias: 00/08-23-52-12 W5M
Location Alias 2: 00/08-23-052-12 W5/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 12
Section: 23
County/Municipality: Yellowhead County
Well Name: BEI CARROT 8-23-52-12
Operator Name: Tangle Creek Energy Ltd.
License Number: 0090120
License Date: 1981-05-13
License Status: Issued
Spud Date: 1981-05-17
Final Drill Date: 1981-06-02
Well Total Depth: 2214.00 m
Surface Hole Latitude: 53.502498
Surface Hole Longitude: -115.652985

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-05-13 Obtained License
1981-06-02 Finished Drilling
1981-06-02 Well Mode changed to Drilled and Cased
1981-06-05 Production Casing Operation Performed
1981-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-08 Perforation Treatment Performed - Jet Perforation
1981-06-10 Perforation Treatment Performed - Fractured
1981-06-30 Perforation Treatment Performed - Jet Perforation
1981-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-11 Well Log Performed
1984-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-13 Perforation Treatment Performed - Jet Perforation
1984-06-13 Plug Back Performed
1984-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-16 Well Began Production
1984-09-16 Well Fluid changed to Crude Oil
1984-09-16 Well Mode changed to Pumping
1989-09-15 Perforation Treatment Performed - Jet Perforation
1989-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-21 Well Fluid changed to Crude Oil
1989-09-21 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-06-08 Perforation 2166.00 2169.50 6
1984-06-13 Perforation 2132.50 2134.00 13
1984-06-14 Acid Treatment 2125.50 2134.00 0
1989-09-15 Perforation 2151.00 2158.50 6
1989-09-15 Perforation 2166.00 2169.50 6
1989-09-18 Acid Treatment 2125.50 2134.00 0
1981-06-08 Acid Treatment 2166.00 2169.50 0
1981-06-10 Fracture 2166.00 2169.50 0
1981-06-30 Perforation 2151.00 2158.50 6
1981-07-01 Acid Treatment 2151.00 2158.50 0
1981-07-17 Acid Treatment 2151.00 2158.50 0
1984-06-13 Packing Device Capped w/Cement 2146.50 2149.00 0
1984-06-13 Perforation 2125.50 2126.50 13
1984-06-13 Perforation 2129.70 2130.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2443 0.0 0.0 0.0
1985 5232 0.0 0.0 0.0
1986 6437 0.0 0.0 0.0
1987 8583 0.0 0.0 0.0
1988 6958 0.0 0.0 0.0
1989 3140 0.0 0.0 0.0
1990 8575 0.0 0.0 0.0
1991 8554 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8584 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8543 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8639 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8615 0.0 0.0 0.0
2004 8319 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8544 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 6286 0.0 0.0 0.0
2012 8599 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 7079 0.0 0.0 0.0
2015 4220 0.0 0.0 0.0
2016 5062 0.0 0.0 0.0
2017 5774 0.0 0.0 0.0
2018 7847 0.0 0.0 0.0
2019 7956 0.0 0.0 0.0
2020 1940 0.0 0.0 0.0

For data sources see[5]

References