X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525122211000

Well Details

Well ID: 0525122211000
Loading map...
Location: 00/11-22-052-12W5/0
Location Alias: 00/11-22-52-12 W5M
Location Alias 2: 00/11-22-052-12 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 12
Section: 22
County/Municipality: Yellowhead County
Well Name: BEI CARROT 11-22-52-12
Operator Name: Tangle Creek Energy Ltd.
License Number: 0088976
License Date: 1981-02-12
License Status: Issued
Spud Date: 1981-02-26
Final Drill Date: 1981-03-18
Well Total Depth: 2236.00 m
Surface Hole Latitude: 53.508275
Surface Hole Longitude: -115.688509

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-02-12 Obtained License
1981-03-18 Finished Drilling
1981-03-21 Production Casing Operation Performed
1981-03-31 Perforation Treatment Performed - Jet Perforation
1981-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-04-04 Perforation Treatment Performed - Jet Perforation
1981-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-09 Perforation Treatment Performed - Fractured
1981-04-27 Perforation Treatment Performed - Jet Perforation
1981-05-24 Well Mode changed to Drilled and Cased
1988-02-21 Well Began Production
1988-02-21 Well Fluid changed to Gas
1988-02-21 Well Mode changed to Flowing
1990-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-01 Well Fluid changed to Gas
2003-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-31 Perforation 2208.50 2210.00 7
1981-04-27 Perforation 2165.00 2170.50 6
1981-04-27 Perforation 2171.00 2171.90 6
1990-12-03 Acid Treatment 2165.00 2186.00 0
1981-03-31 Perforation 2214.00 2216.40 7
1981-03-31 Perforation 2219.50 2221.00 7
1981-04-02 Acid Treatment 2208.50 2221.00 0
1981-04-04 Packing Device Capped w/Cement 2200.00 2205.00 0
1981-04-04 Perforation 2179.00 2183.00 7
1981-04-04 Perforation 2185.00 2186.00 7
1981-04-06 Acid Treatment 2179.00 2186.00 0
1981-04-09 Fracture 2179.00 2186.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 3192 0.0 0.0 0.0
1989 8357 0.0 0.0 0.0
1990 6025 0.0 0.0 0.0
1991 2820 0.0 0.0 0.0
1992 5605 0.0 0.0 0.0
1993 7595 0.0 0.0 0.0
1994 8122 0.0 0.0 0.0
1995 5888 0.0 0.0 0.0
1996 6227 0.0 0.0 0.0
1997 4572 0.0 0.0 0.0
1998 4988 0.0 0.0 0.0
1999 8617 0.0 0.0 0.0
2000 8772 0.0 0.0 0.0
2001 8728 0.0 0.0 0.0
2002 8753 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8616 0.0 0.0 0.0
2010 8595 0.0 0.0 0.0
2011 7936 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8521 0.0 0.0 0.0
2014 7527 0.0 0.0 0.0
2015 4774 0.0 0.0 0.0
2016 4320 0.0 0.0 0.0
2017 8375 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[5]

References