X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525121303000

Well Details

Well ID: 0525121303000
Loading map...
Location: 00/03-13-052-12W5/0
Location Alias: 00/03-13-52-12 W5M
Location Alias 2: 00/03-13-052-12 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 12
Section: 13
County/Municipality: Yellowhead County
Well Name: BEI HZ CARROT 3-13-52-12
Operator Name: Tangle Creek Energy Ltd.
License Number: 0467515
License Date: 2014-06-19
License Status: Issued
Spud Date: 2014-11-23
Final Drill Date: 2014-12-09
Well Total Depth: 3050.00 m
Surface Hole Latitude: 53.487222
Surface Hole Longitude: -115.649054

For data sources see[1][2]

Well History

Date Event
2014-06-19 Obtained License
2014-11-25 Surface Casing Operation Performed
2014-11-28 Direction Drilling Operation Performed - Deviate
2014-12-03 Direction Drilling Operation Performed - Horizontal
2014-12-06 Intermediate Casing Operation Performed
2014-12-09 Finished Drilling
2014-12-09 Well Log Performed
2014-12-09 Well Mode changed to Drilled and Cased
2014-12-10 Liner Casing Operation Performed
2014-12-11 Rig Released
2014-12-17 Perforation Treatment Performed - Open-Hole Completion
2015-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-09 Well Began Production
2015-01-09 Well Fluid changed to Crude Oil
2015-01-09 Well Mode changed to Flowing
2017-01-01 Well Fluid changed to Crude Oil
2017-01-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-23 Nabors Drilling Limited 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-28 1857.00 Deviate (5 - 79 degrees)
2014-12-03 2340.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-17 Open Hole/Barefoot Completion 3041.00 3050.00 0
2015-01-06 Multi-Stage Fracture 3004.80 3004.90 0
2015-01-06 Multi-Stage Fracture 2939.50 2939.60 0
2015-01-06 Multi-Stage Fracture 2787.70 2787.80 0
2015-01-06 Multi-Stage Fracture 2716.00 2716.10 0
2015-01-06 Multi-Stage Fracture 2631.00 2631.10 0
2015-01-06 Multi-Stage Fracture 2572.60 2572.70 0
2015-01-06 Multi-Stage Fracture 2514.30 2514.40 0
2015-01-06 Multi-Stage Fracture 2456.00 2456.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-06 2015-01-06 2,194 1,065 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 79.7259 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 12.0375 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0046 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 8.1437 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.0881 N/A
Oxyalkylated alcohol 9014 100 0.0881 N/A
Petroleum distillates 64742-47-8 100 0.0881 N/A
Polyacrylate 9014 100 0.0881 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-12-17 2015-01-04 Central Water Distribution Facility 1386

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 130 0.0 0.0 0.0
2016 7895 0.0 0.0 0.0
2017 8466 0.0 0.0 0.0
2018 8480 0.0 0.0 0.0
2019 8031 0.0 0.0 0.0
2020 1975 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-09 No Incident Encountered 0.00 0.00
2014-12-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References